Construction Manager, Data Center Construction
Company websiteamazon.com (Amazon, opens in new tab)
Base salary $111,300 – $186,100
Employer-published annual base salary, USD. Advertised base range in New Carlisle, IN
You apply on the employer's own site. Six Figure Work does not handle applications.
- LocationNew Carlisle, IN
- WorkplaceWorkplace not stated
- Status at last checkSource accepting applications when checked
- Last checked (4 h ago) · observed since
About this job
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we’re the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain — and we’re looking for talented people who want to help.
You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You’ll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you’ll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.
As our Data Center Construction Manager (CM), you will be a part of a diverse, upbeat, and creative team tasked with solving fascinating problems constructing Amazon Data Centers. Our data centers are industry-leading examples of energy efficient and cost-effective designs.
You will:
- Own project scope, quality, schedule, and budget for construction of new builds or general capital projects.
- Own construction project management and oversight of construction related activities.
- Work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers.
- Be a leader in your specific discipline (construction management, building services, architectural, electrical or mechanical engineering).
- Represent Amazon’s owner’s representative on construction sites daily, as, interacting with construction trades.
At Amazon, we are all Owners and leverage unique opportunities presented to us by owning everything from the design review to construction bidding, execution, and final hand-off to our customers. We develop innovative data centers for our Customers.
Key job responsibilities
- Be Amazon’s construction representative on multiple data centers building and capital improvement construction project sites from construction start through hand-off to operations.
- Direct interface with construction general contractors during the construction bidding, award, execution, punch-list, and closeout phases.
- Create construction project scope and request for proposals.
- Conduct negotiations with general contractors and evaluate bids and proposals with detail and accuracy.
- Manage and drive cost, schedule, and quality while managing construction contractors and vendors.
- Perform construction project management activities, including management of documents, submittals, RFIs, change orders, invoices, quality, scope, and schedule.
- Drive construction teams to troubleshoot and perform root-cause failure analysis on equipment failures.
- Support commissioning and integrated system testing and oversight.
- Support operations of installed facilities, including review of procedures, best practices, and maintenance initiatives.
- Support capital request creation.
- Analyze and report construction progress and financials.
- Record and report key construction metrics to team members and management.
- Contribute to construction initiatives aimed at improving construction efficiency and increasing data center resiliency.
- Provide constructability reviews for electrical and mechanical designs for new or optimization of existing data centers.
About the team
Why AWS
Amazon Web Services (AWS) is the world’s most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating — that’s why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses.
Work/Life Balance
We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there’s nothing we can’t achieve in the cloud.
Inclusive Team Culture
Here at AWS, it’s in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness.
Mentorship and Career Growth
We’re continuously raising our performance bar as we strive to become Earth’s Best Employer. That’s why you’ll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional.
Basic Qualifications
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field
- Experience carrying new design concepts through exploration, development, and into deployment or mass production
- Experience in MS Excel, Word, and Windows Operating Systems
- Experience with power management and power monitoring systems
Preferred Qualifications
- 5+ years of project management in data centers or comparable critical infrastructure experience
- Knowledge of critical data center equipment
- Knowledge of engineering documentation, electrical diagrams and standard operating procedures
- Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, or OSHA
- Experience in project management in data centers or comparable critical infrastructure
- Experience in Data Center Engineering Operations, with a deep understanding of electrical and mechanical data center infrastructure
- Experience reading and interpreting construction specifications and drawings for all domains
Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status.
Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information. If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner.
The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at https://amazon.jobs/en/benefits.
USA, IN, New Carlisle - 111,300.00 - 186,100.00 USD annually
Source: Amazon · View original posting (opens in new tab)
How this pay compares
Base floor $111,300, above 15% of the 3,741 Program & Project Management roles nationwide on this site; the other 85% list the same floor or a higher one. The employer's range is $74,800 wide, 67% of the floor. Observed open for 17 days so far (since Nov 3, 2026).
Pay in context
Among 3,741 Program & Project Management roles nationwide listed on this site, the median base floor is $135,000 and the middle half runs from $117,000 to $159,100. This role's floor ($111,300) is above 15% of them; 30 others list the same floor.
Base floors of 3,741 Program & Project Management roles nationwide
Table
| Floor band | Share | Postings |
|---|---|---|
| $100K to $125K | 35.0% | 1,308 |
| $125K to $150K | 32.4% | 1,213 |
| $150K to $175K | 17.1% | 639 |
| $175K to $200K | 9.4% | 351 |
| $200K to $225K | 3.3% | 125 |
| $225K to $250K | 1.2% | 44 |
| $250K to $275K | 0.6% | 23 |
| $275K and up | 1.0% | 38 |
How this is calculated
- Statistic
- Base floor distribution of the cohort
- Formula
- count of cohort postings in each $25K band of published base floor / postings in the cohort
- Denominator
- 3,741 open postings with this job family nationwide
- Sample size
- 3741
- Hidden when
- the cohort has fewer than 30 postings
- Calculation version
- jobpage-analysis-v1
- Data as of
- 2026-11-21
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 21, 2026.
How Amazon pays
3,898 of Amazon's 4,159 live roles on this site list a higher base floor and 134 list a lower one. Across them the median floor is $143,700; the middle half runs from $131,300 to $159,300.
Base floors of Amazon's 4,159 live roles
Table
| Floor band | Share | Roles |
|---|---|---|
| $100K to $125K | 17.3% | 720 |
| $125K to $150K | 46.1% | 1,919 |
| $150K to $175K | 22.9% | 953 |
| $175K to $200K | 11.6% | 484 |
| $200K to $225K | 1.6% | 67 |
| $225K to $250K | 0.2% | 8 |
| $250K to $275K | 0.1% | 6 |
| $275K and up | <0.1% | 2 |
How this is calculated
- Statistic
- Employer base floor distribution
- Formula
- count of the employer's open roles in each $25K band of published base floor / its open roles
- Denominator
- 4,159 open public roles at this employer
- Sample size
- 4159
- Hidden when
- this employer has fewer than 5 roles
- Calculation version
- jobpage-analysis-v1
- Data as of
- current
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
Similar pay elsewhere
Other employers' Program & Project Management roles nationwide with the nearest published base floor to $111,300, one per employer.
- Construction Manager, AWS AWS · base floor $111,300
- Technical Lead - Simulation Assisted Engineering GE Vernova · base floor $111,200
- NSCF Construction Coordinator for LBNF DUNE Fermilab · base floor $111,400
- Benefits Realization Manager (Location Flexible) RSM US · base floor $111,200
- Resource Development Project Manager Granite · base floor $111,123
This listingConstruction Manager, Data Center Construction$111,300 – $186,100
Senior Business Coach, Delivery Service Partner Program$110,200 – $149,100
Regional Construction Manager, GES NA, Startup Engineering Risk Management (ERM)From $109,800
Robotics Maintenance Technician, Frontier AI & Robotics (FAR)$110,400 – $191,200
Robotics Data Engineer, Frontier AI & Robotics (FAR)$110,400 – $191,200
Project Engineer$110,400 – $191,200
Software Development Engineer, Bespoke Solutions; ADC Hardware & Software Team$110,500 – $160,000
Chart as a table
| Role | Published base |
|---|---|
| Construction Manager, Data Center Construction (this listing) | $111,300 - $186,100 |
| Senior Business Coach, Delivery Service Partner Program | $110,200 - $149,100 |
| Regional Construction Manager, GES NA, Startup Engineering Risk Management (ERM) | From $109,800 |
| Robotics Maintenance Technician, Frontier AI & Robotics (FAR) | $110,400 - $191,200 |
| Robotics Data Engineer, Frontier AI & Robotics (FAR) | $110,400 - $191,200 |
| Project Engineer | $110,400 - $191,200 |
| Software Development Engineer, Bespoke Solutions; ADC Hardware & Software Team | $110,500 - $160,000 |
Observed changes
No changes to the pay or listing since we first observed this role on Nov 3, 2026 (17 days ago).
- First observed on the employer's board, already publishing a qualifying base salary
- Observed since
- Employer-stated posting date
- 2026-07-29
Where this pay comes from
Location as the employer wrote it: US, IN, New Carlisle
USA, IN, New Carlisle - 111,300.00 - 186,100.00 USD annually
- Method
- Employer text, read with fixed rules and re-verified
- Checked
- Rule set
- us-base-v2
The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.
What we verified
- The pay figures come from the employer's own listing, quoted exactly above.
- The pay is an annual base salary in US dollars with a minimum of at least $100,000.
- The role was publicly listed on the employer's job board when last checked.
We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.
