Six Figure Work

Construction Manager , Data Center Construction

Amazon

Company websiteamazon.com (Amazon, opens in new tab)

Base salary $111,300 – $186,100

Employer-published annual base salary, USD. Advertised base range in Boardman, OR +7 more

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationBoardman, OR +7 more
  • WorkplaceWorkplace not stated
  • Status at last checkSource accepting applications when checked
  • Last checked (4 h ago) · observed since
All 8 locations
  • US, OR, Boardman
  • US, GA, Douglasville
  • US, VA, Stafford
  • US, OH, New Albany
  • US, WA, Seattle
  • US, PA, Berwick
  • US, TX, Coyanosa
  • US, VA, Louisa

About this job

AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain — and we're looking for talented people who want to help.

You'll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You'll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you'll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.

As a Data Center Construction Manager, you will be part of a creative, diverse team tasked with solving fascinating problems in constructing Amazon Data Centers. Our data centers are industry-leading examples of energy-efficient, cost-effective designs. You will work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers.

As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world. You will be on the construction site daily, interacting with the construction trades as Amazon's owner's representative. You will be directly responsible for driving cost, schedule, and quality while managing construction vendors and contractors building data centers.

At Amazon, we are all Owners and leverage unique opportunities presented to us by owning everything from design review to construction bidding to construction execution and final hand-off to our customers. We are a diverse, upbeat, creative team of engineers and managers working daily to develop innovative data centers for our Customers.

Key job responsibilities

The Data Center Construction Manager will be responsible for construction project management and oversight of construction-related activities as they relate to new builds or general capital projects. This includes ownership of the project scope, quality, schedule, and budget.

Some of the typical daily tasks of the Construction Manager:

-Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.

-Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.

-Create construction project scope and requests for proposals.

-Perform financial analysis of construction.

-Manage construction projects for specific initiatives aimed at increasing the resiliency of our data centers.

-Conduct constructability reviews of electrical and mechanical designs associated with the construction of new data centers or optimization of existing data centers.

-Manage construction documents including submittal review, RFIs, change orders, and invoicing.

-Ensure construction project quality control.

Record and report key construction metrics to team members and management.

-Drive teams to perform troubleshooting and root-cause failure analysis associated with equipment failures.

-Be a leader within the group as well as within internal and external teams that support the data center.

A day in the life

**Why AWS**

Amazon Web Services (AWS) is the world’s most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating — that’s why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses.

*Diverse Experiences*

Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn’t followed a traditional path, or includes alternative experiences, don’t let it stop you from applying.

*Work/Life Balance*

We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there’s nothing we can’t achieve in the cloud.

*Inclusive Team Culture*

Here at AWS, it’s in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness.

*Mentorship and Career Growth*

We’re continuously raising our performance bar as we strive to become Earth’s Best Employer. That’s why you’ll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional.

About the team

AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we’re the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain — and we’re looking for talented people who want to help.

You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You’ll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you’ll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.

Basic Qualifications

  • Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field
  • Experience carrying new design concepts through exploration, development, and into deployment or mass production
  • Experience in MS Excel, Word, and Windows Operating Systems
  • Experience with power management and power monitoring systems

Preferred Qualifications

  • 5+ years of project management in data centers or comparable critical infrastructure experience
  • Knowledge of critical data center equipment
  • Knowledge of engineering documentation, electrical diagrams and standard operating procedures
  • Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, or OSHA
  • Experience in project management in data centers or comparable critical infrastructure
  • Experience in Data Center Engineering Operations, with a deep understanding of electrical and mechanical data center infrastructure
  • Experience reading and interpreting construction specifications and drawings for all domains

Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status.

Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information. If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner.

The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at https://amazon.jobs/en/benefits.

USA, GA, Douglasville - 111,300.00 - 186,100.00 USD annually

USA, OH, Johnstown - 111,300.00 - 186,100.00 USD annually

USA, OH, NEW ALBANY - 111,300.00 - 186,100.00 USD annually

USA, OH, New Albany - 111,300.00 - 186,100.00 USD annually

USA, OR, Boardman - 111,300.00 - 186,100.00 USD annually

USA, PA, BERWICK - 111,300.00 - 186,100.00 USD annually

USA, PA, Berwick - 111,300.00 - 186,100.00 USD annually

USA, TX, Coyanosa - 111,300.00 - 186,100.00 USD annually

USA, VA, LOUISA - 111,300.00 - 186,100.00 USD annually

USA, VA, Louisa - 111,300.00 - 186,100.00 USD annually

USA, VA, STAFFORD - 111,300.00 - 186,100.00 USD annually

USA, VA, Stafford - 111,300.00 - 186,100.00 USD annually

USA, WA, SEATTLE - 111,300.00 - 186,100.00 USD annually

USA, WA, Seattle - 111,300.00 - 186,100.00 USD annually

Source: Amazon · View original posting (opens in new tab)

How this pay compares

Base floor $111,300, above 9% of the 130 Engineering (non-software) roles in Oregon on this site; the other 91% list the same floor or a higher one. The employer's range is $74,800 wide, 67% of the floor. Observed open for 17 days so far (since Nov 3, 2026).

Pay in context

Among 130 Engineering (non-software) roles in Oregon listed on this site, the median base floor is $131,100 and the middle half runs from $116,800 to $149,900. This role's floor ($111,300) is above 9% of them; 8 others list the same floor.

Base floors of 130 Engineering (non-software) roles in Oregon

Base floors of 130 Engineering (non-software) roles in Oregon$100K to $125K: 47.7% (62); $125K to $150K: 26.9% (35); $150K to $175K: 12.3% (16); $175K to $200K: 6.2% (8); $200K to $225K: 6.2% (8); $225K to $250K: 0.0% (0); $250K to $275K: 0.8% (1)0%15%30%45%48%10027%12512%1506%1756%2000%225<1%250This job $111K
Each bar counts postings on this site by published base floor, in $K. The marker is this job's floor.
Table
Base floors of 130 Engineering (non-software) roles in Oregon
Floor bandSharePostings
$100K to $125K47.7%62
$125K to $150K26.9%35
$150K to $175K12.3%16
$175K to $200K6.2%8
$200K to $225K6.2%8
$225K to $250K0.0%0
$250K to $275K0.8%1
How this is calculated
Statistic
Base floor distribution of the cohort
Formula
count of cohort postings in each $25K band of published base floor / postings in the cohort
Denominator
130 open postings with this job family in Oregon
Sample size
130
Hidden when
the cohort has fewer than 30 postings
Calculation version
jobpage-analysis-v1
Data as of
2026-11-21
Employer set
Open jobs on this site that publish a base salary of $100,000 or more

Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 21, 2026.

State against nationwide

Median base floor in Oregon vs nationwide

Median published base floor of the same job family, in this state and across all states, next to this job's floor.
Table
Median base floor in Oregon vs nationwide
Valuepostings
Engineering (non-software), Oregon$131,100130
Engineering (non-software), all states$136K7,593
This job's base floor (marked)$111,300
How this is calculated
Statistic
Median floor, state vs nationwide
Formula
median published base floor of each cohort
Denominator
open postings of this job family
Sample size
130 in Oregon; 7593 nationwide
Hidden when
either cohort has fewer than 30 postings
Calculation version
jobpage-analysis-v1
Data as of
2026-11-21
Employer set
Open jobs on this site that publish a base salary of $100,000 or more

How Amazon pays

3,898 of Amazon's 4,159 live roles on this site list a higher base floor and 134 list a lower one. Across them the median floor is $143,700; the middle half runs from $131,300 to $159,300.

Base floors of Amazon's 4,159 live roles

Base floors of Amazon's 4,159 live roles$100K to $125K: 17.3% (720); $125K to $150K: 46.1% (1,919); $150K to $175K: 22.9% (953); $175K to $200K: 11.6% (484); $200K to $225K: 1.6% (67); $225K to $250K: 0.2% (8); $250K to $275K: 0.1% (6); $275K and up: <0.1% (2)0%15%30%45%17%10046%12523%15012%1752%200<1%225<1%250<1%275This job $111K
Each bar counts this employer's live roles by published base floor, in $K. The marker is this job's floor.
Table
Base floors of Amazon's 4,159 live roles
Floor bandShareRoles
$100K to $125K17.3%720
$125K to $150K46.1%1,919
$150K to $175K22.9%953
$175K to $200K11.6%484
$200K to $225K1.6%67
$225K to $250K0.2%8
$250K to $275K0.1%6
$275K and up<0.1%2
How this is calculated
Statistic
Employer base floor distribution
Formula
count of the employer's open roles in each $25K band of published base floor / its open roles
Denominator
4,159 open public roles at this employer
Sample size
4159
Hidden when
this employer has fewer than 5 roles
Calculation version
jobpage-analysis-v1
Data as of
current
Employer set
Open jobs on this site that publish a base salary of $100,000 or more

Similar pay elsewhere

Other employers' Engineering (non-software) roles in Oregon with the nearest published base floor to $111,300, one per employer.

This range next to 6 other live Amazon roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Amazon roles with the nearest advertised base floor
RolePublished base
Construction Manager , Data Center Construction (this listing)$111,300 - $186,100
Senior Business Coach, Delivery Service Partner Program$110,200 - $149,100
Regional Construction Manager, GES NA, Startup Engineering Risk Management (ERM)From $109,800
Robotics Maintenance Technician, Frontier AI & Robotics (FAR)$110,400 - $191,200
Robotics Data Engineer, Frontier AI & Robotics (FAR)$110,400 - $191,200
Project Engineer$110,400 - $191,200
Software Development Engineer, Bespoke Solutions; ADC Hardware & Software Team$110,500 - $160,000

Same $100K to $400K scale as every card. All Amazon roles · How to read the bar

Observed changes

No changes to the pay or listing since we first observed this role on Nov 3, 2026 (17 days ago).

  1. First observed on the employer's board, already publishing a qualifying base salary
Observed since
Employer-stated posting date
2026-09-10
Where this pay comes from

Location as the employer wrote it: Multiple locations (8)

USA, GA, Douglasville - 111,300.00 - 186,100.00 USD annually

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.

Get Six Figure Work by email

Pick what you want. Nothing is selected for you unless it matches the page you are on, and nothing is sent until you confirm from a link we email you.

What would you like to receive?

A short weekly note on what employer-published pay data shows: who pays what, where, and what is changing. Once a week.

Practical notes for job seekers: interviewing, applying for six-figure roles, and making an upward move. About twice a month.

New jobs that match a search you choose. Every job listed has an employer-published base salary of $100,000 or more. At most one email a day (or weekly, your choice). Nothing is sent on days with no new matches. Alerts cover every new job, because this page has no filters.

We email you only after you confirm from a link we send to this address. We do not sell or share your address. Every email has a one-click unsubscribe link. How we handle your email.