Six Figure Work

Construction Scheduler

Cumming Group

Company websitecumming-group.com (Cumming Group, opens in new tab)

Base salary $120,200  to $160,267

Employer-published annual base salary, USD. Advertised base range in Los Angeles, CA

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationLos Angeles, CA
  • WorkplaceWorkplace not stated
  • Status at last checkSource accepting applications when checked
  • Last checked (1 h ago) · observed since

About this job

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!



Our firm is currently hiring a Construction Scheduler based in the Los Angeles, CA area to support public works project types. The Construction Scheduler will develop, maintain, and report on schedules for a portfolio of recovery and rebuild capital projects. This is an outstanding opportunity to bring your specialized construction scheduling expertise to an industry leading team.


Essential Duties & Responsibilities:

  • Develop and maintain comprehensive project schedules, identify relationships, logic, milestones, and constraints for a large public agency Capital Improvement Program (CIP).
  • Review contractor baseline schedule submissions to verify that all work scope is properly identified and logically sequenced. Provide detailed written comments and feedback to ensure alignment with project objectives and timelines.
  • Perform quality assurance and quality control (QA/QC) on contractor schedule submittals, ensuring conformance with the contract. Review critical path, cost loading, resource loading (man-hours), schedule content, recovery schedules, logic relationships, lags, constraints, and milestones for accuracy and completeness.
  • Perform time impact analysis for any change orders that affect the construction schedule and participate in negotiations between the client Project Manager and contractors to resolve delay time settlements and mitigate schedule impacts.
  • Conduct critical path analysis and earned value analysis regularly to ensure that construction projects remain on track and meet time and budget requirements. Provide reports to identify potential issues and corrective actions.
  • Regularly perform QA/QC reviews on program schedules and master schedules to ensure accuracy and compliance with program standards. Ensure proper use of program-level standard codes, layouts, and reports to maintain data integrity.

Required Education and Experience:

  • Bachelor's degree in Construction Management, Engineering, Architecture, or related field.
  • Minimum of ten (10) years of experience in creating, updating, and maintaining project schedules for public agency CIP projects.
  • Advanced proficiency in scheduling software, including Primavera P6 and Microsoft Project.
  • Ability to develop critical path method (CPM) baseline schedules and maintain them through regular updates.
  • Ability to build and maintain an integrated master program schedule across multiple concurrent projects.
  • Ability to prepare and evaluate time impact analyses and delay claims.
  • Ability to perform resource loading and cost loading and to support earned value reporting.
  • Ability to produce clear schedule narratives, look-ahead schedules, milestone reports, and executive level summaries.
  • Effective oral and written communication skills.
  • Experience with disaster recovery or post-disaster rebuild programs preferred.

#LI-SV1

Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group’s policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.

All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.

The salary range for this full-time role is $120,200.00-$160,266.69 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.

In addition to base salary, Cumming Group offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program

Source: Cumming Group on Workday · View original posting (opens in new tab)

Pay in context

This role's base floor ($120,200) is above 17% of the 749 Program & Project Management roles in California listed on this site; 3 others list the same floor. Their median floor is $150,000; the middle half runs from $125,300 to $176,400.

Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 7, 2026.

This range next to 6 other live Cumming Group roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Cumming Group roles with the nearest advertised base floor
RolePublished base
Construction Scheduler (this listing)$120,200 - $160,267
Senior Scheduler$120,200 - $160,267
Senior Scheduler$120,200 - $160,267
Senior Estimator - Life Science/Pharmaceutical Construction$120,200 - $181,733
Senior Scheduler$120,200 - $160,267
Project Scheduler$120,200 - $160,267
Cost Control Manager$120,200 - $160,267

Same $100K to $400K scale as every card. All Cumming Group roles · How to read the bar

Observed changes

  1. First observed on the employer's board
  2. Began meeting the published-salary criteria
  3. Absent from the employer's board; confirmation pending
  4. Closure observed on Oct 28, 2026
  5. Reappeared on the employer's board
Observed since
Employer-stated posting date
2026-10-16
Where this pay comes from

Location as the employer wrote it: Los Angeles, CA

The salary range for this full-time role is $120,200.00-$160,266.69 per year. Ranges are determined based on the position, geog

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.