Data Center Construction Scheduler
Company websitecoreweave.com (CoreWeave, opens in new tab)
Base salary $157K – $210K
Employer-published annual base salary, USD. Advertised base range in Livingston, NJ +4 more
You apply on the employer's own site. Six Figure Work does not handle applications.
- LocationLivingston, NJ +4 more
- WorkplaceWorkplace not stated
- Status at last checkSource accepting applications when checked
- Last checked (1 h ago) · observed since
All places named
- Livingston, NJ
- New York, NY
- Sunnyvale, CA
- San Francisco, CA
- Bellevue, WA
About this job
CoreWeave is The Essential Cloud for AI™. Built for pioneers by pioneers, CoreWeave delivers a platform of technology, tools, and teams that enables innovators to build and scale AI with confidence. Trusted by leading AI labs, startups, and global enterprises, CoreWeave combines superior infrastructure performance with deep technical expertise to accelerate breakthroughs and turn compute into capability. Founded in 2017, CoreWeave became a publicly traded company (Nasdaq: CRWV) in March 2025. Learn more at www.coreweave.com.
About the Team
As a P6 Scheduler at CoreWeave, you will play a key role in planning, coordinating, and delivering the large-scale construction initiatives that are critical to CoreWeave’s mission. You will keep project timelines accurately and promptly scheduled and forecast in Primavera P6 across our data center developments.
Key Responsibilities:
- Develop and manage comprehensive master program construction schedules in Primavera P6 for CoreWeave’s hyperscale data center initiatives.
- Work with construction, engineering, and operations teams to maintain milestone programs and keep them aligned with overall project goals.
- Perform schedule risk assessments and support mitigation planning.
- Visit sites regularly to assess progress and validate contractor performance against the schedule.
- Lead critical path and near-critical path reviews with cross-functional stakeholders.
- Produce schedule reports and support the project controls team with analytics and forecast updates.
- Coordinate scope alignment with trades and internal teams to keep schedules accurate.
- Provide recovery plans and corrective action guidance when delays or risks come up.
- Track schedule deliverables, facilitate schedule review meetings, and provide what-if scenario analysis.
- Support reporting requirements for leadership, clients, and regulatory compliance.
Qualifications:
- Bachelor’s degree in Engineering, Construction Management, or a related field, or equivalent practical experience.
- 5+ years of hands-on experience with Primavera P6 or MS Project on large-scale construction projects.
- Experience with data centers, high-tech infrastructure, or mission-critical facilities.
- Proficiency with float management, the critical path method (CPM), and sequencing logic.
- Strong communication skills, with the ability to turn complex schedule data into clear updates for diverse stakeholders.
- Proficiency in Smartsheet and Microsoft Office.
Preferred Skills:
- Certifications such as PMP, PSP (AACE), or CCM.
Why CoreWeave?
At CoreWeave, we work hard, have fun, and move fast! We’re in an exciting stage of hyper-growth that you will not want to miss out on. We’re not afraid of a little chaos, and we’re constantly learning. Our team cares deeply about how we build our product and how we work together, which is represented through our core values:
- Be Curious at Your Core
- Act Like an Owner
- Empower Employees
- Deliver Best-in-Class Client Experiences
- Achieve More Together
We support and encourage an entrepreneurial outlook and independent thinking. We foster an environment that encourages collaboration and enables the development of innovative solutions to complex problems. As we get set for takeoff, the organization’s growth opportunities are constantly expanding. You will be surrounded by some of the best talent in the industry, who will want to learn from you, too. Come join us!
Compensation & Benefits
The base salary range for this role is $157,000 to $210,000. The starting salary will be determined by job-related knowledge, skills, experience, and the market location. We strive for both market alignment and internal equity when determining compensation. In addition to base salary, our total rewards package includes a discretionary bonus, equity awards, and a comprehensive benefits program (all based on eligibility).
What We Offer
In addition to a competitive salary, we offer a variety of benefits to support your needs. The benefits below reflect our US-based offerings for full-time employees; for roles in other locations, benefits vary and are shared during the hiring process. These include:
- Medical, dental, and vision insurance - 100% paid for by CoreWeave
- Company-paid Life Insurance
- Voluntary supplemental life insurance
- Short and long-term disability insurance
- Flexible Spending Account
- Health Savings Account
- Tuition Reimbursement
- Ability to Participate in Employee Stock Purchase Program (ESPP)
- Mental Wellness Benefits through Spring Health
- Family-Forming support provided by Carrot
- Paid Parental Leave
- Flexible, full-service childcare support with Kinside
- 401(k) with a generous employer match
- Flexible PTO
- Catered lunch each day in our office and data center locations
- A casual work environment
- A work culture focused on innovative disruption
California Applicants
California Consumer Privacy Act
Equal Opportunity & Accommodations
CoreWeave is an equal opportunity employer, committed to fostering an inclusive and supportive workplace. All qualified applicants and candidates will receive consideration for employment without regard to race, color, religion, sex, disability, age, sexual orientation, gender identity, national origin, veteran status, or genetic information.
As part of this commitment and consistent with the Americans with Disabilities Act (ADA), CoreWeave will ensure that qualified applicants and candidates with disabilities are provided reasonable accommodations for the hiring process, unless such accommodation would cause an undue hardship. If reasonable accommodation is needed, please contact: [email protected].
Export Control Compliance
This position requires access to technology and/or source code subject to U.S. export control laws. Any such access will be provided only in compliance with applicable U.S. export control requirements. As part of the recruitment process, CoreWeave may request limited information reasonably necessary to assess applicable export-control requirements.
Source: CoreWeave on Greenhouse · View original posting (opens in new tab)
How this pay compares
Base floor $157,000, above 79% of the 429 Program & Project Management roles in Washington on this site. The employer's range is $53,000 wide, 34% of the floor. Observed open for 10 days so far (since Nov 11, 2026).
Pay in context
Among 429 Program & Project Management roles in Washington listed on this site, the median base floor is $145,188 and the middle half runs from $120,000 to $148,700. This role's floor ($157,000) is above 79% of them; 4 others list the same floor.
Base floors of 429 Program & Project Management roles in Washington
Table
| Floor band | Share | Postings |
|---|---|---|
| $100K to $125K | 29.1% | 125 |
| $125K to $150K | 48.3% | 207 |
| $150K to $175K | 5.6% | 24 |
| $175K to $200K | 14.5% | 62 |
| $200K to $225K | 1.4% | 6 |
| $225K to $250K | 0.7% | 3 |
| $250K to $275K | 0.0% | 0 |
| $275K and up | 0.5% | 2 |
How this is calculated
- Statistic
- Base floor distribution of the cohort
- Formula
- count of cohort postings in each $25K band of published base floor / postings in the cohort
- Denominator
- 429 open postings with this job family in Washington
- Sample size
- 429
- Hidden when
- the cohort has fewer than 30 postings
- Calculation version
- jobpage-analysis-v1
- Data as of
- 2026-11-21
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 21, 2026.
State against nationwide
Median base floor in Washington vs nationwide
Table
| Value | postings | |
|---|---|---|
| Program & Project Management, Washington | $145,188 | 429 |
| Program & Project Management, all states | $135K | 3,740 |
| This job's base floor (marked) | $157K |
How this is calculated
- Statistic
- Median floor, state vs nationwide
- Formula
- median published base floor of each cohort
- Denominator
- open postings of this job family
- Sample size
- 429 in Washington; 3740 nationwide
- Hidden when
- either cohort has fewer than 30 postings
- Calculation version
- jobpage-analysis-v1
- Data as of
- 2026-11-21
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
How CoreWeave pays
132 of CoreWeave's 259 live roles on this site list a higher base floor and 108 list a lower one. Across them the median floor is $165,000; the middle half runs from $139,000 to $182,000.
Base floors of CoreWeave's 259 live roles
Table
| Floor band | Share | Roles |
|---|---|---|
| $100K to $125K | 12.4% | 32 |
| $125K to $150K | 22.4% | 58 |
| $150K to $175K | 23.9% | 62 |
| $175K to $200K | 31.7% | 82 |
| $200K to $225K | 7.3% | 19 |
| $225K to $250K | 1.5% | 4 |
| $250K to $275K | 0.0% | 0 |
| $275K and up | 0.8% | 2 |
How this is calculated
- Statistic
- Employer base floor distribution
- Formula
- count of the employer's open roles in each $25K band of published base floor / its open roles
- Denominator
- 259 open public roles at this employer
- Sample size
- 259
- Hidden when
- this employer has fewer than 5 roles
- Calculation version
- jobpage-analysis-v1
- Data as of
- current
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
Similar pay elsewhere
Other employers' Program & Project Management roles in Washington with the nearest published base floor to $157,000, one per employer.
- Tech Infra Program Manager III - AMZ25868.4 Amazon · base floor $158,350
- Director, Cost Management Cumming Group · base floor $159,400
- Data Center Technical Program Manager ALTEN Technology USA · base floor $160,000
- Principal Technical Program Management Axon · base floor $153,825
- Manager - Operations Program Manager, Amazon Leo, Electronics Supply Chain Amazon Leo · base floor $151,000
This listingData Center Construction Scheduler$157K – $210K
Senior Network Engineer I$153K – $204K
Software Engineer, Kubernetes$153K – $204K
Senior Systems Engineer, Virtualization$153K – $204K
Senior Software Engineer I, Security Infrastructure$153K – $204K
Senior Counsel, Employment$157K – $210K
Senior Technology Design Manager - Data Hall Fit Out$157K – $210K
Chart as a table
| Role | Published base |
|---|---|
| Data Center Construction Scheduler (this listing) | $157K - $210K |
| Senior Network Engineer I | $153K - $204K |
| Software Engineer, Kubernetes | $153K - $204K |
| Senior Systems Engineer, Virtualization | $153K - $204K |
| Senior Software Engineer I, Security Infrastructure | $153K - $204K |
| Senior Counsel, Employment | $157K - $210K |
| Senior Technology Design Manager - Data Hall Fit Out | $157K - $210K |
Observed changes
- First observed on the employer's board, already publishing a qualifying base salary
- Listing details edited by the employer
- Observed since
- Employer-stated posting date
- 2026-11-11
Where this pay comes from
Location as the employer wrote it: Livingston, NJ / New York, NY / Sunnyvale, CA / San Francisco, CA / Bellevue, WA
The base salary range for this role is $157,000 to $210,000. The starting salary will be determined by job-related know
- Method
- Employer text, read with fixed rules and re-verified
- Checked
- Rule set
- us-base-v2
The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.
What we verified
- The pay figures come from the employer's own listing, quoted exactly above.
- The pay is an annual base salary in US dollars with a minimum of at least $100,000.
- The role was publicly listed on the employer's job board when last checked.
We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.
