Six Figure Work

Design Project Lead – Data Center Construction

Turner & Townsend

Company websiteturnerandtownsend.com (Turner & Townsend, opens in new tab)

Base salary $160K  to $190K

Employer-published annual base salary, USD. Advertised base range in San Francisco, CA

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationSan Francisco, CA
  • WorkplaceRemote
  • Status at last checkSource accepting applications when checked
  • Last checked (1 h ago) · observed since

About this job

Company Description

Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries. 

Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people’s lives. Working in partnership makes it possible to deliver the world’s most impactful projects and programs as we turn challenge into opportunity and complexity into success. 

Our capabilities include program, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions. 

We are majority-owned by CBRE Group, Inc., the world’s largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier program, project and cost management offering in markets around the world. 

Job Description

Turner & Townsend is seeking an experienced Design Project Lead to join our team. As an integral part of the Design Development and Delivery Team, this role will operate as the Design Project Lead overseeing the design and construction administration as an Owner’s Representative, and lead the Civil, Structural, Landscape, Architecture (CSLA) disciplines as a subject matter expert.

The Design Project Lead will collaborate with multiple stakeholders including cross-discipline partners across the Design Engineering organization, internal partners such as Planning and Development, Construction Management, Quality, Safety, and Operations as well as external partners including engineers of record (EoR), general contractors, and regulatory agencies to deliver data center capacity safely, on time, within budget, and of high quality. This position is full-time providing directional guidance aligned with the pace of fast-tracked design and construction.

Job Description:  

  • Provides support and reports to the assigned Project Manager(s) or Project Director.  Position has frequent interaction with the Owner/Client, consultants, design professionals and contractors.  
  • Directly assist the Project Manager(s) in managing, coordinating and administering the project through all phases of design and construction.  
  • Responsible for ensuring all aspects of client services are delivered at the highest level to ensure the client’s needs are addressed.  
  • Aids in the preparation of documents (reports, schedules, invoices, RFI’s, submittals, meeting minutes/agendas, daily reports, change orders, inspections, closeout and client presentations) for programming, design and construction and will assist in maintaining information in project management software.  
  • Coordinate to schedule meetings with the project team as directed by the Project Manager(s).  
  • Communicate conceptual designs and create/maintain project documentation before, during, and after construction.  
  • Maintenance of Basis of Design, prototype design, and template specifications for architectural elements.  
  • Review and inform design RFPs.  
  • Manage our external design consultants through the design and construction process.  
  • Effectively communicate design standards to internal and external project partners.  
  • Manage multiple fast paced projects simultaneously.  
  • Think outside of the box to find innovative solutions prior to and during the construction process to reduce costs without negative impacts on quality or reliability.  
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable. 

Qualifications

  • College Degree in Business Administration, Construction Management, Engineering, Architecture.  
  • 8+ years’ experience in mission critical building design, construction and or operations.
  • Experience and working in Project Management on large-scale construction programs.  
  • Experienced in Design/Architecture/Civil works.  
  • Solid working proficiency with AutoCAD, Revit, Bluebeam, and MS Office Suite.  
  • Excellent presentation skills and the ability to be highly effective in a client-facing role.  
  • Team player; ability to work collaboratively.  

Additional Information

The salary range for this full-time role is $160K-$190K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package.  Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications.

*On-site presence and requirements may change depending on our client's needs.

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.

Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.

Please find out more about us at www.turnerandtownsend.com/ and https://www.heery.com/

All your information will be kept confidential according to EEO guidelines.

Join our social media conversations for more information about Turner & Townsend and our exciting future projects: 

Twitter

Instagram

LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time. 

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review. 

Source: Turner & Townsend on SmartRecruiters · View original posting (opens in new tab)

Pay in context

This role's base floor ($160,000) is above 75% of the 2,481 Program & Project Management roles nationwide listed on this site; 35 others list the same floor. Their median floor is $135,000; the middle half runs from $117,000 to $157,500.

Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 6, 2026.

This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
RolePublished base
Design Project Lead – Data Center Construction (this listing)$160K - $190K
Commercial Construction Risk Manager$160K - $170K
Risk Manager$160K - $170K
Risk Manager$160K - $170K
Commercial Construction Risk Manager$160K - $170K
Associate Director Cost Manager – Industrial and Maritime Construction$160K - $180K
Project Controls Lead - Data Center Construction$160K - $190K

Same $100K to $400K scale as every card. All Turner & Townsend roles · How to read the bar

Observed changes

  1. First observed on the employer's board
  2. Began meeting the published-salary criteria
  3. fields changed
Observed since
Employer-stated posting date
2026-10-12
Where this pay comes from

Location as the employer wrote it: San Francisco, California, United States (remote)

The salary range for this full-time role is $160K-$190K per year. Ranges are determined by role and level and repre

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.