Six Figure Work

Mechanical OFCI Design Manager - Data Center Construction

Turner & Townsend

Company websiteturnerandtownsend.com (Turner & Townsend, opens in new tab)

Base salary $170K  to $210K

Employer-published annual base salary, USD. Advertised base range in United States

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationUnited States
  • WorkplaceRemote
  • Status at last checkSource accepting applications when checked
  • Last checked (32 min ago) · observed since

About this job

Company Description

Who is Turner & Townsend?

All over the world people are using buildings, infrastructure, and assets we helped to deliver. It could be the hospital they work in, the railway they travel on every day, the fuel that powers their car or the data centre they depend on at work. For more than 75 years we’ve been helping to deliver transformational programmes across the real estate, infrastructure and natural resources sectors, making a difference to people’s lives and ensuring a return on investment for our clients and their investors.

Our purpose:

Transforming performance for a green, inclusive, and productive world.

The world is changing and we have a responsibility to support that change, helping drive it and be part of it. Through the commitment, capability and care our team brings, we build trust between clients, suppliers, governments and society. Delivering better outcomes that have a positive impact on the world around us. We work smarter to face the challenges of the future; bringing the clarity that helps teams realise their full potential across the real estate, infrastructure and natural resources sectors. It’s how we’ve made the difference for more than 75 years.

Our values:

Love a challenge: We love a challenge and we work hard to make change happen and see things through. We don’t stand still, challenging ourselves and others to do better every day. And we are trusted to do the right thing, raising standards all the time.

Stronger together: We’re stronger together by connecting people in diverse teams, so that we can all collaborate to deliver our best work. We focus on what matters and use our influence to build a better world for everyone.

Bring out the best in everyone: We bring out the best in everyone. We help each other to make the most of our potential, always learning from our experience. We treat each other with care and respect and make time to give everyone a voice

Job Description

Turner & Townsend are seeking an Mechanical OFCI Design Manager to lead the design management and coordination of owner-furnished, contractor-installed (OFCI) mechanical equipment for a hyperscale data center campus. Reporting to senior program leadership, you will enforce technical standards, oversee long-lead procurement specifications for mechanical equipment such as chillers, CRAH/CRAC units, cooling distribution units (CDUs), air-cooled and dry coolers, pumps, and heat rejection systems, and ensure seamless integration between owner-supplied equipment and contractor scopes. You will guide design teams, review submittals, resolve interface risks, and align deliverables with schedule, cost, and commissioning requirements. The ideal candidate has multiple years of mission-critical mechanical design experience, a deep understanding of data center cooling architectures, and the leadership skills to drive multi-phase delivery in a fast-paced, high-growth environment.

Responsibilities: 

  • Strong leadership skills, experience leading a project management team, ensuring they deliver on all accountabilities. 
  • Lead communications with the client and oversight of project management team services. 
  • Lead research related to construction market conditions, including analysis of official published data. 
  • Produce thought leadership reports providing valuable insights to the construction market 
  • Lead the strategic and operational management of Project Management Services in a variety of sectors, including resource planning and management, financial management, business generation and training and development. 
  • Set a clear strategy and ambition with the team in line with our Business Plan 
  • Grow and develop exceptional people, promoting a culture of learning, respect and inclusivity. 
  • Knowledge management – Ensure that key information and learning generated from each commission is inputted into internal databases and shared. 
  • Process improvement – Identify and act upon ways to improve internal systems and processes. 
  • Quality Control – Ensure compliance with quality standards and participation in ISO audits. 
  • Develop priority plans including risk mitigation through internal tools, make performance measurements via Key Performance Indicators (KPI) and appraisal documents, management controls and critical success factors based on company goals 
  • Undertake internal BMS audits, and coordinate and represent the office for external audits undertaken by the external certification authority. 
  • Develop a detailed understanding of the market, acting as a brand ambassador and creating a pipeline of opportunity with existing and new clients 
  • Identify and act upon cross-selling opportunities. 
  • Participate in meetings with Senior leadership, Directors and staff and prepare and deliver presentations 
  • Financial Management – Using internal software, track ongoing revenue, margin levels and monthly fees and resource requirements for each cost ,amahe commission.  
  • Preparation of proposals/RFP responses for new clients/projects. 
  • Attend relevant networking events and other promotional opportunities with directors. 
  • Support the training and mentorship of current staff and promote an upward career trajectory. 
  • Proactively partner with talent acquisition team to attract the best talent, actively manage resource requirements and proactively plan for future staffing needs. 
  • Be a role model that drives a one business culture that achieves great outcomes by striking the right balance for our people, clients, stakeholders, and society.  
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable. 

Qualifications

  • Bachelor’s degree in construction management, architecture, engineering or field related to construction. 
  • Graduate degree in construction management, architecture, or engineering is preferred. 
  • 12+ years of relevant construction project management experience.  
  • 2+ years managing large high performing multi discipline teams in a consulting environment.  
  • Proven track record of managing successful project management service delivery for clients. 
  • Exceptional Business development ambition and acumen and demonstrated experience in achieving drive business growth. 
  • Major construction sector experience working with high caliber clients in; commercial real estate, data center, life sciences, industrial manufacturing, natural resources, etc. 
  • Demonstrates excellent presentation, verbal, written, organizational, and communication skills.

Additional Information

The salary range for this full-time role is $170K-$210K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package.  Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications. 

*On-site presence and requirements may change depending on our client's needs.*

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance. 

Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.

Please find out more about us at www.turnerandtownsend.com/

#LI-AP5

Join our social media conversations for more information about Turner & Townsend and our exciting future projects: 

Twitter

Instagram

LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time. 

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review. 

Join our social media conversations for more information about Turner & Townsend and our exciting future projects: 

Twitter

Instagram

LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time. 

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review. 

Source: Turner & Townsend on SmartRecruiters · View original posting (opens in new tab)

Pay in context

This role's base floor ($170,000) is above 59% of the 965 Design roles nationwide listed on this site; 29 others list the same floor. Their median floor is $157,419; the middle half runs from $132,000 to $184,000.

Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 8, 2026.

This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
RolePublished base
Mechanical OFCI Design Manager - Data Center Construction (this listing)$170K - $210K
Associate Director- Construction Management- Progressive Design Build projects (Anticipated Opening)$170K - $220K
Lead Scheduler (Data Center Due Diligence and Preconstruction)$170K - $210K
Project Manager-Aviation Construction (Anticipated Opening)$170K - $200K
Controls Design Manager - Data Center Construction$170K - $210K
Electrical OFCI Design Manager - Data Center Construction$170K - $210K
Mechanical Design Manager - Data Center Construction$170K - $210K

Same $100K to $400K scale as every card. All Turner & Townsend roles · How to read the bar

Observed changes

  1. First observed on the employer's board
  2. Began meeting the published-salary criteria
  3. fields changed
Observed since
Employer-stated posting date
2026-10-26
Where this pay comes from

Location as the employer wrote it: USA wide, United States (remote)

The salary range for this full-time role is $170K-$210K per year. Ranges are determined by role and level and repre

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.

Get Six Figure Work by email

Pick what you want. Nothing is selected for you unless it matches the page you are on, and nothing is sent until you confirm from a link we email you.

What would you like to receive?

A short weekly note on what employer-published pay data shows: who pays what, where, and what is changing. Once a week.

Practical notes for job seekers: interviewing, applying for six-figure roles, and making an upward move. About twice a month.

New jobs that match a search you choose. Every job listed has an employer-published base salary of $100,000 or more. At most one email a day (or weekly, your choice). Nothing is sent on days with no new matches. Alerts cover every new job, because this page has no filters.

We email you only after you confirm from a link we send to this address. We do not sell or share your address. Every email has a one-click unsubscribe link. How we handle your email.