Mechanical Project Manager - Data Center Construction
Company websiteturnerandtownsend.com (Turner & Townsend, opens in new tab)
Base salary $135K to $175K
Employer-published annual base salary, USD. Advertised base range in United States
You apply on the employer's own site. Six Figure Work does not handle applications.
- LocationUnited States
- WorkplaceWorkplace not stated
- Status at last checkSource accepting applications when checked
- Last checked (1 h ago) · observed since
About this job
Company Description
Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries.
Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people’s lives. Working in partnership makes it possible to deliver the world’s most impactful projects and programmes as we turn challenge into opportunity and complexity into success.
Our capabilities include programme, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions.
We are majority-owned by CBRE Group, Inc., the world’s largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier programme, project and cost management offering in markets around the world.
Job Description
Turner & Townsend is seeking an Mechanical Project Manager – Data Center Construction with Field Experience to support a high-profile data center construction project. This individual will be responsible for overseeing the General Contractor’s construction activities, with a strong focus on reporting on schedule status back to the project owner. The ideal candidate will bring deep technical expertise from working in the field, strong leadership, and a background in large-scale data center/mission critical works or electrical contracting environments.
Responsibilities:
- Effectively manage and collaborate with project stakeholders.
- Effective communication across our internal team to ensure efficiency and a consistent delivery to the client.
- Can analyze, track, and effectively manage critical milestone activities to avoid schedule slip.
- Verify that effective project governance, processes and systems are utilized.
- Ensure application of best practice on all projects.
- Production of formal project status reports and other reports as required.
- Monitor the progress of multiple construction projects simultaneously to ensure that the approved design standards are being applied correctly.
- Manage the interface between all suppliers through monthly trackers and weekly reviews.
- Manage the flow of project information between the project team through regular meetings and written communications.
- Forecast and update key project milestones.
- Manage and monitor local design teams in accordance with commission criteria.
- Provide technical support to owners, architects, general contractors and regional stakeholders.
- Rapid response to RFIs from the field.
- Provide expertise for cost control, value engineering, and constructability guidance where required.
- Independent review of status reports, drawing submittals, timelines and costs from architects, contractors and suppliers.
- Client management – assist in developing excellent working relationships with Clients, with a view towards maximizing new opportunities.
- Strategic Thinking - provides advice to project teams on approaches that can be adopted to successfully achieve both clients’ objectives and business objectives.
- Knowledge management – ensure that key information and learnings generated from each project is captured.
- Process improvement – Identify ways to improve internal systems and processes
- SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
Qualifications
- Bachelor’s degree in Mechanical Engineering, Construction Management, or related field.
- Minimum 5+ years of electrical project management experience, ideally in data center construction or with an electrical contractor.
- Experience with substation and power distribution systems preferred.
- Familiarity with MEP design
- Strong leadership, communication, and problem-solving skills.
- Proficiency in project management tools
- Knowledge of relevant codes, standards, and construction methodologies.
- Proficiency in the Data Center Commissioning Process (levels 1 –5 )
- Proficiency managing construction documents including BODs, specifications, contract drawings, C/D/E’s, equipment submittals and RFIs.
- Proficiency in Excel, Word, PowerPoint, Outlook, Procore, P6, CxAlloy, and other construction project management tools
Additional Information
The salary range for this full-time role is $135K-175K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package. Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications.
*On-site presence and requirements may change depending on our clients' needs.*
Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.
We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.
Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.
Please find out more about us at www.turnerandtownsend.com/
Turner & Townsend does not accept any speculative or unsolicited CV’s that have been sent to our internal recruitment team or hiring managers from agencies outside of our preferred supplier list or that have not followed due process. Any speculative or unsolicited CV’s will be treated as a direct application.
All your information will be kept confidential according to EEO guidelines.
#LI-MK3
Join our social media conversations for more information about Turner & Townsend and our exciting future projects:
It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.
Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.
Source: Turner & Townsend on SmartRecruiters · View original posting (opens in new tab)
Pay in context
This role's base floor ($135,000) is above 58% of the 135 Program & Project Management roles in Texas listed on this site; 2 others list the same floor. Their median floor is $127,100; the middle half runs from $115,600 to $148,700.
Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 7, 2026.
This listingMechanical Project Manager - Data Center Construction$135K to $175K
Senior Cost Manager / Quantity Surveyor - Data Center Construction$135K to $165K
Senior Cost Manager / Quantity Surveyor - Data Center Construction$135K to $165K
Senior Cost Manager / Quantity Surveyor - Data Center Construction$135K to $165K
Construction Manager$135K to $180K
Senior Estimator – Industrial and Maritime Construction$135K to $160K
Electrical Project Manager - Data Center Construction$135K to $175K
Chart as a table
| Role | Published base |
|---|---|
| Mechanical Project Manager - Data Center Construction (this listing) | $135K - $175K |
| Senior Cost Manager / Quantity Surveyor - Data Center Construction | $135K - $165K |
| Senior Cost Manager / Quantity Surveyor - Data Center Construction | $135K - $165K |
| Senior Cost Manager / Quantity Surveyor - Data Center Construction | $135K - $165K |
| Construction Manager | $135K - $180K |
| Senior Estimator – Industrial and Maritime Construction | $135K - $160K |
| Electrical Project Manager - Data Center Construction | $135K - $175K |
Observed changes
- First observed on the employer's board
- fields changed
- Began meeting the published-salary criteria
- Observed since
- Employer-stated posting date
- 2026-08-07
Where this pay comes from
Location as the employer wrote it: Amarillo, TEXAS, United States
The salary range for this full-time role is $135K-175K per year. Ranges are determined by role and level and repre
- Method
- Employer text, read with fixed rules and re-verified
- Checked
- Rule set
- us-base-v2
The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.
What we verified
- The pay figures come from the employer's own listing, quoted exactly above.
- The pay is an annual base salary in US dollars with a minimum of at least $100,000.
- The role was publicly listed on the employer's job board when last checked.
We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.
