QA/QC Manager - Data Center Construction
Company websitecumming-group.com (Cumming Group, opens in new tab)
Base salary $104,600 to $139,467
Employer-published annual base salary, USD. Advertised base range in Fort Worth, TX
You apply on the employer's own site. Six Figure Work does not handle applications.
- LocationFort Worth, TX
- WorkplaceWorkplace not stated
- Status at last checkSource accepting applications when checked
- Last checked (3 h ago) · observed since
About this job
At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 10 rankings in ENR. With over 60 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!
We are seeking a highly skilled and motivated QA/QC Manager to be part of our team in Fort Worth, TX.
The QA/QC Manager for Data Center Construction will oversee all quality assurance and quality control functions for a major new build data center project. This role ensures construction meets mechanical, electrical, and process requirements while maintaining full compliance with owner's standards and specifications. You may lead a team of discipline specific quality inspectors, manage documentation, coordinate with contractors, and support turnover and commissioning activities.
The successful candidate must be self-motivated, technically skilled, highly organized, communicate clearly and have a proven ability to work in a fast-paced dynamic environment. Candidates’ work history must represent increased levels of responsibility on a progressive basis throughout their career.
A relocation package may be available for outstanding candidates.
RESPONSIBILITIES
- Develop, implement, and maintain the project-wide QA/QC plan in alignment with semiconductor facility standards.
- Establish inspection and testing protocols for mechanical, electrical, structural, and equipment installations.
- Lead quality meetings with contractors, engineering teams, and the owner.
- Manage the project's quality documentation structure (DWNs, NCRs, RFIs, QA logs, closeout document requirements).
- Observes commissioning meetings and updates senior project management on project commissioning progress, targets, and risk elements
- Collaboration with project construction teams to fine tune the construction schedule and integrate all the necessary equipment and system components to meet pre-requisites for equipment tagging.
- Verifies that the General Contractors uphold obligations with respect to their commissioning and quality program deliverables.
- Ensures equipment maintenance via the Construction Manager is upheld until handover.
- Maintains the warranty program and follows up on completion of warranty tasks.
- Review documentation for completeness and compliance with best quality practices and in accordance with AHJ, General Contractor and owner requirements.
- Perform all activities in a safe and responsible manner and support all Environmental, Health, Safety, Security requirements, and programs.
- Coordinate with the owner on all quality matters.
- Prior to the start of construction, meet with the owner or authorized representative to review the details of the contractor’s Quality Control Plan's components, forms, control activities, testing and any other items to ensure a complete and mutual understanding of the QC plan and procedures and alignment with the site Quality Assurance Plan and project specifications
- Participate in internal and external site audits
- Monitor the implementation of the approved site Quality Assurance Plan
- Coordinate with the site construction lead on all quality issues and provide technical support to resolve quality issues.
- Assure all technical documents related to site quality control are utilized
- Manage Owner’s 3rd Party Special Inspection Agencies
REQUIREMENTS
- Minimum 6 years of construction experience and quality control management or industrial Building Inspector experience, ideally in data center or industrial projects.
- General knowledge of other applicable codes and standards.
- Knowledge of QAQC CPM scheduling in the construction environment.
- Have experience with interpreting and enforcing contract requirements, drawings, specifications and applicable codes.
- Demonstrated proficiency and experience with the following tools: Microsoft Office software. Experience with document control and commissioning software programs would be beneficial.
EDUCATION & CERTIFICATIONS
- Bachelor’s degree in construction management, architecture or engineering, or related field preferred
- Equivalent experience in the field will be considered in lieu of formal education.
#LI-VM1
Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group’s policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.
All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.
The salary range for this full-time role is $104,600.00-$139,466.68 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.In addition to base salary, Cumming Group offers a comprehensive benefits package including:
- Medical
- Dental Insurance
- Vision Insurance
- 401(k)
- 401(k) Matching
- Paid Time Off
- Paid Holidays
- Short and long-term disability
- Employee Assistance Program
Source: Cumming Group on Workday · View original posting (opens in new tab)
This listingQA/QC Manager - Data Center Construction$104,600 to $139,467
Senior Cost Manager – Data Center Construction$104,600 to $139,467
Project Manager II$104,600 to $139,467
Project Manager - Data Center Construction$104,600 to $139,467
Senior Scheduler$104,600 to $139,467
Senior Scheduler$104,600 to $139,467
Senior Estimator - Life Science/Pharmaceutical Construction$104,600 to $198,200
Chart as a table
| Role | Published base |
|---|---|
| QA/QC Manager - Data Center Construction (this listing) | $104,600 - $139,467 |
| Senior Cost Manager – Data Center Construction | $104,600 - $139,467 |
| Project Manager II | $104,600 - $139,467 |
| Project Manager - Data Center Construction | $104,600 - $139,467 |
| Senior Scheduler | $104,600 - $139,467 |
| Senior Scheduler | $104,600 - $139,467 |
| Senior Estimator - Life Science/Pharmaceutical Construction | $104,600 - $198,200 |
Observed changes
- First observed on the employer's board
- Began meeting the published-salary criteria
- Observed since
- Employer-stated posting date
- 2026-07-21
Where this pay comes from
Location as the employer wrote it: Fort Worth, TX
The salary range for this full-time role is $104,600.00-$139,466.68 per year. Ranges are determined based on the position, geog
- Method
- Employer text, read with fixed rules and re-verified
- Checked
- Rule set
- us-base-v2
The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.
What we verified
- The pay figures come from the employer's own listing, quoted exactly above.
- The pay is an annual base salary in US dollars with a minimum of at least $100,000.
- The role was publicly listed on the employer's job board when last checked.
We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.
