Senior Construction Scheduler
Company websiteparsons.com (Parsons, opens in new tab)
Base salary $103,500 to $181,100
Employer-published annual base salary, USD. Advertised base range in Fort Sam Houston, TX +1 more
You apply on the employer's own site. Six Figure Work does not handle applications.
- LocationFort Sam Houston, TX +1 more
- WorkplaceWorkplace not stated
- Status at last checkSource accepting applications when checked
- Last checked (57 min ago) · observed since
All places named
- Fort Sam Houston, TX
- San Antonio, TX
About this job
Job Description:
Parsons is seeking a Scheduler to join our Owner’s Advisor team supporting the Medical Enlisted Training Campus (METC) Recapitalization Program at Joint Base San Antonio–Fort Sam Houston. This mission-critical initiative will deliver five modern dormitory facilities for up to 6,000 joint-service medical students and the associated infrastructure.
Working alongside government leaders, military stakeholders, designers, and contractors, you will help manage risk, protect the government’s interests, and support the successful delivery of a high-profile Progressive Design-Build program. This is a unique opportunity to contribute to a landmark campus, advance innovative delivery methods, and help shape the future of large-scale Air Force infrastructure programs.
What You'll Be Doing:
- Develop independent schedule analysis and integrated forecasting across design, manufacturing, shipping, construction, utilities, and acceptance.
- Give program leadership clear evidence of constraints and realistic recovery options.
- Review and maintain the owner’s integrated schedule model aligned to the approved contractor schedule and milestones.
- Validate logic, calendars, durations, critical paths, resources, float, and links between factories and site work fronts.
- Analyze production quantities and rates using consistent units for beds, rooms, modules, shipments, and crane lifts.
- Integrate field progress, look-ahead constraints, utility readiness, and commissioning prerequisites into forecasts.
- Perform schedule risk and what-if analysis; evaluate change impacts and proposed recovery sequencing.
- Prepare concise schedule narratives, variance reports, decision deadlines, and milestone confidence assessments.
What Required Skills You'll Bring:
- Must be a US Citizen
- Bachelor's degree in Construction Management, Engineering, Architecture, Business, or related field; 4 addition years of relevant experience will substitute for a degree.
- 10+ years of experience in scheduling for construction projects or federal contracting operations.
- Proficiency in Primavera P6 or equivalent CPM scheduling software and advanced spreadsheet analysis.
- Strong understanding of construction sequencing, critical path method (CPM), and project controls.
- Experience supporting utility, construction, or infrastructure projects preferred
- Strong understanding of scheduling logic, resource planning, and cost integration
- Strong communication and collaboration skills in a cross-functional environment
- Ability to manage multiple priorities in a deadline-driven setting
- Excellent analytical, problem-solving, and communication skills.
- Ability to obtain and maintain unescorted access to JBSA Fort Sam Houston.
- Ability to maintain a one team mentality amongst all stakeholders.
What Desired Skills You'll Bring
- Experience project scheduling for large scale Federal or DoD construction projects
- Former Military Construction/Engineering experience a plus
- Experience performing 14-point schedule assessment or similar schedule quality reviews
- AACE PSP or PMI-SP credential; quantitative schedule risk modeling experience.
- Federal design-build, factory production/logistics, five-building or comparable concurrent campus delivery, and commissioning schedules.
Security Clearance Requirement:
NoneThis position is part of our Federal Solutions team.The Federal Solutions segment delivers resources to our US government customers that ensure the success of missions around the globe. Our intelligent employees drive the state of the art as they provide services and solutions in the areas of defense, security, intelligence, infrastructure, and environmental. We promote a culture of excellence and close-knit teams that take pride in delivering, protecting, and sustaining our nation's most critical assets, from Earth to cyberspace. Throughout the company, our people are anticipating what’s next to deliver the solutions our customers need now.Salary Range: $103,500.00 - $181,100.00We value our employees and want our employees to take care of their overall wellbeing, which is why we offer best-in-class benefits such as medical, dental, vision, paid time off, Employee Stock Ownership Plan (ESOP), 401(k), life insurance, flexible work schedules, and holidays to fit your busy lifestyle!Parsons is an equal opportunity employer, and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability, veteran status or any other protected status.We truly invest and care about our employee’s wellbeing and provide endless growth opportunities as the sky is the limit, so aim for the stars! Imagine next and join the Parsons quest—APPLY TODAY!Parsons is aware of fraudulent recruitment practices. To learn more about recruitment fraud and how to report it, please refer to https://www.parsons.com/fraudulent-recruitment/.
Source: Parsons on Workday · View original posting (opens in new tab)
Pay in context
This role's base floor ($103,500) is above 2% of the 135 Program & Project Management roles in Texas listed on this site; 1 other lists the same floor. Their median floor is $127,100; the middle half runs from $115,600 to $148,700.
Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 7, 2026.
This listingSenior Construction Scheduler$103,500 to $181,100
Construction Surveillance Technician - CST$103,500 to $181,100
Workflow Support Specialist$103,500 to $181,100
Information System Security Officer - Topsecret$103,500 to $181,100
Scheduler$103,500 to $181,100
Security Cooperation Manager$103,500 to $181,100
Project Controls Specialist$103,500 to $181,100
Chart as a table
| Role | Published base |
|---|---|
| Senior Construction Scheduler (this listing) | $103,500 - $181,100 |
| Construction Surveillance Technician - CST | $103,500 - $181,100 |
| Workflow Support Specialist | $103,500 - $181,100 |
| Information System Security Officer - Topsecret | $103,500 - $181,100 |
| Scheduler | $103,500 - $181,100 |
| Security Cooperation Manager | $103,500 - $181,100 |
| Project Controls Specialist | $103,500 - $181,100 |
Observed changes
- First observed on the employer's board
- Began meeting the published-salary criteria
- Absent from the employer's board; confirmation pending
- Closure observed on Oct 27, 2026
- Reappeared on the employer's board
- fields changed
- Observed since
- Employer-stated posting date
- 2026-11-04
Where this pay comes from
Location as the employer wrote it: US - TX, Fort Sam Houston • US - TX, San Antonio
Salary Range: $103,500.00 - $181,100.00
- Method
- Employer text, read with fixed rules and re-verified
- Checked
- Rule set
- us-base-v2
The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.
What we verified
- The pay figures come from the employer's own listing, quoted exactly above.
- The pay is an annual base salary in US dollars with a minimum of at least $100,000.
- The role was publicly listed on the employer's job board when last checked.
We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.
