Six Figure Work

Senior Cost Manager (Data Center Construction)

Cumming Group

Company websitecumming-group.com (Cumming Group, opens in new tab)

Base salary $130,500 – $174,033

Employer-published annual base salary, USD. Advertised base range in New York, NY

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationNew York, NY
  • WorkplaceWorkplace not stated
  • Status at last checkSource accepting applications when checked
  • Last checked (2 h ago) · observed since

About this job

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!



In this role, you will be a member of our highly reputable cost management and estimating team. The cost team delivers solutions to clients in the areas of conceptual estimating, budget development, cost planning, feasibility studies, value management, economic forecasting, milestone reports, pre- and post-contract auditing, change order review and reconciliation, BIM 5D cost modeling, LEED cost analysis, life cycle costing, and more. We encourage you to research us to learn more about our outstanding reputation within this service line.


We are currently hiring for a Senior Cost Manager in New York, NY. In this role, you will have the opportunity to work on data center and/or mission critical projects where you will be heavily involved in a variety of tasks ranging from estimating, cost controls, risk, and overall client management.


Essential Duties & Responsibilities:

  • Develop detail-level budgets, cost models, and order-of-magnitude estimates from limited design information, narratives, or schematic drawings during early pre-construction phases.
  • Project Assessment: Thoroughly evaluate project specifications, plans, and requirements to gain a comprehensive understanding of the project scope and objectives.
  • Material Takeoffs: Conduct detailed material takeoffs to quantify the required materials and resources for each project component accurately.
  • Cost Estimation: Utilize advanced construction estimating software and industry-standard methodologies to prepare precise cost estimates. This includes labor, materials, equipment, and contractor costs.
  • Cost Analysis: Analyze project costs, including direct and indirect expenses, overhead, and profit margins, to determine a competitive yet profitable bid price.
  • Competitive Analysis: Research and analyze competitors' bids and pricing strategies to develop competitive and profitable proposals.
  • Value Engineering: Collaborate with project teams to explore value engineering options and cost-saving alternatives without compromising project quality.
  • Estimate Review: Collaborate with estimating teams to review and refine estimates, ensuring accuracy, completeness, and adherence to company standards.
  • Bid Strategy: Develop and execute comprehensive bid strategies, considering factors such as project complexity, market conditions, and client expectations.
  • Bid Preparation: Lead the creation of thorough and organized bid packages, ensuring compliance with bid submission requirements, deadlines, and contractual obligations.
  • Client Interaction: Engage with clients and project stakeholders to clarify project specifications, answer inquiries, and build positive relationships.
  • Review, interpret and accurately estimate the scope of assigned work as described in the project documents. 
  • Develop and nurture sub-contractor, vendor, and client relationships. 
  • Lead client accounts. 
  • Review and comment on contracts and participate in contract negotiation. 
  • Prepare sub-contractor analysis sheets for assigned scope of work. 
  • Evaluate changes and subcontractor change order estimates and provide expertise in all phases of construction work. 
  • Perform Continuous Cost Management. 
  • Manage contract administration at the project level. 
  • Partner with management team in developing new customers and growing existing customer base. 
  • Develop and nurture client relationships to ensure client satisfaction. 
  • Support senior management by providing needed reports and responding to inquiries for information. 
  • Mentor associate level cost and commercial managers. 
  • Prepare project plans.
  • Other duties as assigned.
  • Attendance at work during normal business hours.

Knowledge & Skills Required:

  • Understand how your role contributes to the organization's goals. 
  • Deliver quality work product by role modeling organizational core values. 
  • Hold self accountable to individual and team goals. 
  • Consistently communicate and collaborate with team members and clients. 
  • Build relationships with peers, leaders, and clients. 
  • Proactively participate in self-development to continually enhance current skills and build new skills required to excel at current role and prepare for career progression. 
  • Provide pricing expertise in various phases of construction work. 
  • Partner with management team in developing new customers and growing existing customer base. 
  • Strong research skills and ability to allocate the relevant data. 
  • Exposure to industry events, functions, & creating a network of key AEC professionals in the market. 
  • Ability to effectively integrate with other departments. 
  • Ability to quickly analyze, compare, and interpret detailed but sometimes poorly defined information. 
  • Understand construction technology, economics of construction, construction delivery methodologies, local requirements on tax and insurances as they impact construction costs, ability to understand general conditions and general requirements at a detailed level.  
  • Understand construction law in the local market, applicable methods of measurement and approaches to parametric, top down and bottoms up estimates. 
  • Possess a working knowledge of the different roles and services Cumming provides and how the cost management team fits in the project. 
  • Ability to communicate with various stakeholders, internal and external to the company in a responsive manner. 
  • Ability to multi-task, prioritize, and work efficiently. 
  • Ability to perform at high levels in a fast paced, ever-changing work environment. 
  • Demonstrate consistent management of overall project assigned beyond tasks completion. 
  • Hold a professional qualification relative to your job role. 

Preferred Education and Experience:

  • Education: Bachelor's degree in Construction, Cost Management, Engineering, Quantity Surveying, or related field.
  • Minimum of 7 years' experience in Estimating, Cost Management or Quantity Surveying is required.
  • Preferred Certification: MRICS, AssocRICS, CCP, CEP, CPE or equivalent is preferred.
  • Experience working on data center and/or mission critical projects is required.
  • Proficient in CostX, OST and Microsoft Excel.

Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group’s policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.

All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.

The salary range for this full-time role is $130,500.00-$174,033.36 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.

In addition to base salary, Cumming Group offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program
  • Company-Paid Parental Leave
  • State Paid Family and Medical Leave (where applicable)
  • Lifestyle Spending Account (LSA)
  • Professional Development & Tuition Assistance
#LI-PJ1

Source: Cumming Group on Workday · View original posting (opens in new tab)

How this pay compares

Base floor $130,500. The employer's range is $43,533 wide, 33% of the floor. Observed open for 4 days so far (since Nov 24, 2026).

How Cumming Group pays

60 of Cumming Group's 123 live roles on this site list a higher base floor and 62 list a lower one. Across them the median floor is $127,300; the middle half runs from $115,100 to $150,400.

Base floors of Cumming Group's 123 live roles

Base floors of Cumming Group's 123 live roles$100K to $125K: 45.5% (56); $125K to $150K: 28.5% (35); $150K to $175K: 25.2% (31); $175K to $200K: 0.0% (0); $200K to $225K: 0.8% (1)0%15%30%45%46%10028%12525%1500%175<1%200This job $130K
Each bar counts this employer's live roles by published base floor, in $K. The marker is this job's floor.
Table
Base floors of Cumming Group's 123 live roles
Floor bandShareRoles
$100K to $125K45.5%56
$125K to $150K28.5%35
$150K to $175K25.2%31
$175K to $200K0.0%0
$200K to $225K0.8%1
How this is calculated
Statistic
Employer base floor distribution
Formula
count of the employer's open roles in each $25K band of published base floor / its open roles
Denominator
123 open public roles at this employer
Sample size
123
Hidden when
this employer has fewer than 5 roles
Calculation version
jobpage-analysis-v1
Data as of
current
Employer set
Open jobs on this site that publish a base salary of $100,000 or more
This range next to 6 other live Cumming Group roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Cumming Group roles with the nearest advertised base floor
RolePublished base
Senior Cost Manager (Data Center Construction) (this listing)$130,500 - $174,033
Senior Construction Project Manager (cGMP - Pharma Manufacturing Facility)$127,300 - $178,233
Senior Project Manager$127,300 - $178,233
Senior Project Manager (Healthcare)$127,300 - $178,233
Associate Director, Cost Management$127,300 - $178,233
Associate Director, Cost Management (Data Centers)$127,300 - $178,233
Associate Director, Cost Management$127,300 - $178,233

Same $100K to $400K scale as every card. All Cumming Group roles · How to read the bar

Observed changes

No changes to the pay or listing since we first observed this role on Nov 24, 2026 (4 days ago).

  1. First observed on the employer's board, already publishing a qualifying base salary
Observed since
Employer-stated posting date
2026-11-23
Where this pay comes from

Location as the employer wrote it: New York, NY

The salary range for this full-time role is $130,500.00-$174,033.36 per year. Ranges are determined based on the position, geog

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.

Get Six Figure Work by email

Pick what you want. Nothing is selected for you unless it matches the page you are on, and nothing is sent until you confirm from a link we email you.

What would you like to receive?

A short weekly note on what employer-published pay data shows: who pays what, where, and what is changing. Once a week.

Practical notes for job seekers: interviewing, applying for six-figure roles, and making an upward move. About twice a month.

New jobs that match a search you choose. Every job listed has an employer-published base salary of $100,000 or more. At most one email a day (or weekly, your choice). Nothing is sent on days with no new matches. Alerts cover every new job, because this page has no filters.

We email you only after you confirm from a link we send to this address. We do not sell or share your address. Every email has a one-click unsubscribe link. How we handle your email.