Senior Cost Manager – Data Center Construction
Company websiteturnerandtownsend.com (Turner & Townsend, opens in new tab)
Base salary $145K – $165K
Employer-published annual base salary, USD. Advertised base range in United States
You apply on the employer's own site. Six Figure Work does not handle applications.
- LocationUnited States
- WorkplaceRemote
- Status at last checkSource accepting applications when checked
- Last checked (4 h ago) · observed since
About this job
Company Description
Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries.
Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people’s lives. Working in partnership makes it possible to deliver the world’s most impactful projects and programs as we turn challenge into opportunity and complexity into success.
Our capabilities include program, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions.
We are majority-owned by CBRE Group, Inc., the world’s largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier program, project and cost management offering in markets around the world.
Job Description
Turner & Townsend is seeking an experienced Senior Cost Manager to join our programmatic cost and schedule team supporting our client’s data center sites from lease signature to Ready for Service (RFS). The role prepares the owner’s cost report and gives our client an independent read on cost exposure through construction.
Responsibilities:
Lease signature to mobilization
- Join weekly OAC-style calls; review developer cost reports and the cost impact of each change.
- Carry forward Cost Reimbursable Agreement-funded Long Lead Equipment status; track GMP buyout, LLE POs and GC labor; track contract status against the committed schedule.
- Provide inputs to the owner’s cost report, build the cost record and WBS mapping, and run what-if cost scenarios; hand over the cost baseline to the onsite team.
Mobilization to RFS
- Prepare the monthly owner’s cost report for Senior Project Manager sign-off: cost review of change against benchmarks and baselines, and of potential cost exposure to our client, against the change log.
- On open-book deal sites, report committed and forecast cost against our client’s approved budget and track contingency and allowance drawdown.
- Establish the site cost baseline in the first 30 days; maintain the cost side of the Risk Exposure Log.
- Provide cost trends for the monthly site review and cost input to exception escalation briefs, including developer and GC notices of delay and force majeure (tracking and escalation only).
- Join the weekly site call and OAC with cost input; visit the site from the regional hub; record actuals to the portfolio benchmark at RFS.
- Cover three to four projects; share program-wide tools, templates and the portfolio cost reporting standard.
- Work with the Senior Schedule Manager to quantify the cost impact of schedule exceptions and acceleration options.
- Do not perform quantity surveying, estimating on behalf of the developer or GC [only the owner/client that we are working for], spend validation or audit, or approve change orders and invoices.
- Operate within the owner’s representative scope boundary: monitor, report and escalate through our client; do not direct the developer, general contractor or trades, exercise design authority, or certify progress for payment. Decision rights remain with our client. Stop-work authority applies only to imminent danger.
- SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
Project/Program specifications:
- Project/Program specific responsibilities: Owner’s representative cost reporting (cost baseline, risk exposure, change cost, monthly site review, owner’s cost report and exception briefs) on closed-book and open-book (Yield-on-Cost) sites; pre-lease (ELL) assignments, where applicable, include CRA and EIR review, ROM and WBS 3 benchmarking, and developer budget review.
- Market sector experience: Hyperscale / mission-critical data center construction.
- Software specific requirements: Excel (advanced), Google Suite, Power BI or equivalent, cost management and forecasting tools; developer and GC cost platforms as read-only users.
- Certification requirements: RICS, AACE or equivalent preferred.
- Work location: Regional hub (Northern Virginia, Dallas, San Francisco or Canada) with monthly visits to active sites.
Qualifications
- Bachelor’s degree in construction management, cost management, quantity surveying, engineering or field related to construction.
- Minimum 7 years of relevant experience working in a cost management role in the construction industry.
- RICS accredited or working towards it is preferred.
- Experience of leading cost management on medium or large sized construction projects of medium to high complexity; data center experience preferred.
- Good knowledge of cost benchmarking, change valuation, forecasting, contingency management and open-book contract structures.
- Construction consultancy experience is strongly preferred.
- Excellent communication skills, with the discretion and independence to review developer and GC figures.
Additional Information
*On-site presence and requirements may change depending on our client's needs.
The base salary range for this role is $145K-$165K USD. This range reflects the company's good faith estimate of the base salary for this position at the time of the posting. Final compensation will be determined based on factors including experience, skills, qualifications, and internal equity. In addition to base salary, employees may be eligible for bonuses and a comprehensive benefits package.
Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.
We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.
Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.
Please find out more about us at www.turnerandtownsend.com/ and https://www.heery.com/
All your information will be kept confidential according to EEO guidelines.
Join our social media conversations for more information about Turner & Townsend and our exciting future projects:
It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.
Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.
Source: Turner & Townsend on SmartRecruiters · View original posting (opens in new tab)
How this pay compares
Base floor $145,000. The employer's range is $20,000 wide, 14% of the floor. First observed today.
How Turner & Townsend pays
74 of Turner & Townsend's 264 live roles on this site list a higher base floor and 182 list a lower one. Across them the median floor is $135,000; the middle half runs from $120,000 to $150,000.
Base floors of Turner & Townsend's 264 live roles
Table
| Floor band | Share | Roles |
|---|---|---|
| $100K to $125K | 27.7% | 73 |
| $125K to $150K | 44.3% | 117 |
| $150K to $175K | 21.6% | 57 |
| $175K to $200K | 5.3% | 14 |
| $200K to $225K | 0.8% | 2 |
| $225K to $250K | 0.0% | 0 |
| $250K to $275K | 0.4% | 1 |
How this is calculated
- Statistic
- Employer base floor distribution
- Formula
- count of the employer's open roles in each $25K band of published base floor / its open roles
- Denominator
- 264 open public roles at this employer
- Sample size
- 264
- Hidden when
- this employer has fewer than 5 roles
- Calculation version
- jobpage-analysis-v1
- Data as of
- current
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
This listingSenior Cost Manager – Data Center Construction$145K – $165K
Senior Construction Manager-Public Sector (Anticipated Opening)$145K – $180K
Senior Project Controls Consultant – Data Center Construction$145K – $165K
Senior Mechanical/Plumbing Construction Estimator - Data Center Construction$145K – $150K
Senior Construction Project Manager-OAR II- (Anticipated Opening)$145K – $180K
Senior Electrical Construction Estimator - Data Center Construction$145K – $150K
Senior Cost Manager - Healthcare Construction$145K – $170K
Chart as a table
| Role | Published base |
|---|---|
| Senior Cost Manager – Data Center Construction (this listing) | $145K - $165K |
| Senior Construction Manager-Public Sector (Anticipated Opening) | $145K - $180K |
| Senior Project Controls Consultant – Data Center Construction | $145K - $165K |
| Senior Mechanical/Plumbing Construction Estimator - Data Center Construction | $145K - $150K |
| Senior Construction Project Manager-OAR II- (Anticipated Opening) | $145K - $180K |
| Senior Electrical Construction Estimator - Data Center Construction | $145K - $150K |
| Senior Cost Manager - Healthcare Construction | $145K - $170K |
Observed changes
No changes to the pay or listing since we first observed this role on Nov 19, 2026 (today).
- First observed on the employer's board, already publishing a qualifying base salary
- Observed since
- Employer-stated posting date
- 2026-11-19
Where this pay comes from
Location as the employer wrote it: USA wide, United States (remote)
The base salary range for this role is $145K-$165K USD. This range reflects the company's good faith estimate
- Method
- Employer text, read with fixed rules and re-verified
- Checked
- Rule set
- us-base-v2
The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.
What we verified
- The pay figures come from the employer's own listing, quoted exactly above.
- The pay is an annual base salary in US dollars with a minimum of at least $100,000.
- The role was publicly listed on the employer's job board when last checked.
We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.
