Six Figure Work

Senior CSA Estimator - Data Center Construction

Turner & Townsend

Company websiteturnerandtownsend.com (Turner & Townsend, opens in new tab)

Base salary $130K  to $170K

Employer-published annual base salary, USD. Advertised base range in United States

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationUnited States
  • WorkplaceRemote
  • Status at last checkSource accepting applications when checked
  • Last checked (1 h ago) · observed since

About this job

Company Description


Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries. 

Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people’s lives. Working in partnership makes it possible to deliver the world’s most impactful projects and programmes as we turn challenge into opportunity and complexity into success. 

Our capabilities include programme, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions. 

We are majority-owned by CBRE Group, Inc., the world’s largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier programme, project and cost management offering in markets around the world. 

Job Description


Turner & Townsend is seeking an experienced Senior CSA Estimator to support a high‑profile client’s large‑scale, multi‑building data center campus programs. The role focuses on developing detailed civil, structural, and architectural (CSA) estimates for complex, innovative core‑and‑shell facilities.

This position requires advanced estimating expertise, the ability to operate effectively in fast‑paced and evolving environments, and proven experience supporting multi‑phase delivery across major capital construction programs.

Candidates for this role must be physically based in the United States and legally authorized to work in the U.S. Remote work is permitted only from within the United States; candidates located outside the U.S. cannot be considered for remote employment.


Responsibilities:

  • Develop and manage cost plans and detailed estimates from concept through detailed design across multiple geographies; lead estimate reviews with internal and external teams.
  • Present milestone cost updates (concept, schematic, DD, CD) and clearly communicate basis of estimate, assumptions, inclusions/exclusions, and risks.
  • Lead quantity takeoffs and cost checks for complex, multi‑package CSA scopes; ensure alignment between scope, drawings/models, and estimate.
  • Provide program‑level estimating for defined scopes, synthesizing inputs across multiple projects/campuses to support portfolio‑level decisions.
  • Review contractor pricing (bids, pay applications, change orders); perform comparative assessments and prepare recommendations.
  • Drive benchmarking and cost modeling; build, maintain, and apply historical cost data and metrics; support life‑cycle cost (LCC) analyses.
  • Facilitate value engineering (VE); develop cost/benefit options and support feasibility and early‑stage cost modeling.
  • Support procurement and preconstruction, including prequalification, bid list development, bid analysis, tender reporting, and contract documentation.
  • Partner with cost management, procurement, and project controls to align estimating outputs with budgets, commercial strategy, and program‑level planning.
  • Assess design evolutions and produce timely estimate updates at appropriate accuracy levels.
  • Mentor and coordinate support staff; contribute to training materials, templates, and internal/external estimating tools.
  • Prepare leadership‑ready content for client preconstruction and estimating presentations.
  • SOX control responsibilities may be part of this role and must be adhered to where applicable.

Qualifications

  • Bachelor’s degree in construction management, cost management, quantity surveying, engineering or field related to construction. 
  • Minimum 5-7 years of relevant experience 
  • Experience in a construction cost management role such as Cost Manager, Quantity Surveyor, Estimator, Cost Engineer, Project Engineer, Project Cost Controls etc. 
  • Experience providing conceptual estimating services and/or pre-construction services at a construction management or related firm. 
  • Experience supporting large scale construction projects and programs 
  • Good knowledge of construction industry technical matters, such as value management and value engineering. 
  • Excellent communication skills. 

Additional Information


*On-site presence and requirements may change depending on our client's needs.*

The base salary range for this full-time role is $130K-$170K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package.  Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications. 

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance. 

Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.

Please find out more about us at www.turnerandtownsend.com/

Turner & Townsend does not accept any speculative or unsolicited CV’s that have been sent to our internal recruitment team or hiring managers from agencies outside of our preferred supplier list or that have not followed due process. Any speculative or unsolicited CV’s will be treated as a direct application.


All your information will be kept confidential according to EEO guidelines.
 

#LI-MB1

Join our social media conversations for more information about Turner & Townsend and our exciting future projects: 

Twitter

Instagram

LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time. 

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review. 

Source: Turner & Townsend on SmartRecruiters · View original posting (opens in new tab)

This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
RolePublished base
Senior CSA Estimator - Data Center Construction (this listing)$130K - $170K
Senior Construction Project Manager - Government$130K - $160K
Senior Construction Project Manager-K-12 Projects$130K - $150K
Senior Construction Project Manager- Federal Projects (Anticipated Opening)$130K - $180K
Senior Consultant - Procurement, Contracts and Supply Chain$130K - $165K
Senior Cost Manager / Quantity Surveyor - Commercial Real Estate$130K - $160K
Design Manager- Aviation Construction (Anticipated Opening)$130K - $175K

Same $100K to $400K scale as every card. All Turner & Townsend roles · How to read the bar

Observed changes

  1. First observed on the employer's board
  2. Began meeting the published-salary criteria
  3. fields changed
Observed since
Employer-stated posting date
2026-08-06
Where this pay comes from

Location as the employer wrote it: USA wide, United States (remote)

The base salary range for this full-time role is $130K-$170K per year. Ranges are determined by role and level and repre

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.