Senior Electrical Cost Estimator - Data Center Construction
Company websiteturnerandtownsend.com (Turner & Townsend, opens in new tab)
Base salary $100K – $170K
Employer-published annual base salary, USD. Advertised base range in San Francisco, CA
You apply on the employer's own site. Six Figure Work does not handle applications.
- LocationSan Francisco, CA
- WorkplaceRemote
- Status at last checkSource accepting applications when checked
- Last checked (4 h ago) · observed since
About this job
Company Description
Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries.
Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people’s lives. Working in partnership makes it possible to deliver the world’s most impactful projects and programs as we turn challenge into opportunity and complexity into success.
Our capabilities include program, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions.
We are majority-owned by CBRE Group, Inc., the world’s largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier program, project and cost management offering in markets around the world.
Job Description
Turner & Townsend is seeking an experienced Senior Electrical Estimator to support cost management and estimating activities on large-scale data center and mission-critical construction projects. This role will play a key part in the planning and delivery of hyperscale and colocation developments by providing accurate cost planning, estimating, and commercial guidance throughout all phases of the project lifecycle.
Candidates for this role must be physically based in the United States and legally authorized to work in the U.S. Remote work is permitted only from within the United States; candidates located outside the U.S. cannot be considered for remote employment. Preference will be given to candidates located in or near San Francisco, CA.
Responsibilities:
- Develop conceptual, schematic, design development, and detailed electrical cost estimates and cost plans.
- Prepare and present estimate deliverables, cost reports, and commercial recommendations to clients and project teams.
- Support feasibility studies, budgeting, cost benchmarking, and business case development for data center projects.
- Review drawings, specifications, and vendor information to develop accurate electrical estimates and quantity takeoffs.
- Lead procurement activities, including bid package development, contractor prequalification, bid evaluations, leveling, and recommendations.
- Review and validate subcontractor and vendor pricing for electrical systems and equipment.
- Manage post-contract cost control activities, including change management, forecasting, and cost variance analysis.
- Produce monthly cost reports and present findings to stakeholders and leadership teams.
- Support value engineering initiatives and identify cost-saving opportunities while maintaining project objectives.
- Collaborate closely with clients, designers, contractors, and supply chain partners throughout all project phases.
- Mentor junior estimators and cost management professionals.
- Support client relationship management and business development initiatives.
- SOX control responsibilities may form part of this role and must be adhered to where applicable.
Qualifications
- Strong technical experience across all areas of cost management, including pre-contract, post-contract, and final account.
- Extensive experience estimating electrical scopes for data centers, mission-critical facilities, advanced technology, industrial, or large-scale commercial projects.
- Strong understanding of medium-voltage and low-voltage electrical systems, substations, switchgear, generators, UPS systems, transformers, busway, and power distribution infrastructure.
- Experience preparing conceptual through detailed estimates for large and complex construction projects.
- Strong knowledge of contractor means and methods, procurement strategies, and construction delivery models.
- Demonstrated ability to review drawings, specifications, and design documentation to identify scope and pricing risks.
- Excellent presentation, verbal, written, and client-facing communication skills.
- Proficiency with Microsoft Office, Bluebeam, AutoCAD, Navisworks, and related estimating software.
- Strong organizational skills and ability to manage multiple priorities in a fast-paced environment.
- Experience supporting value management, value engineering, and lifecycle costing initiatives.
- Experience working directly with clients and contributing to business development efforts.
- Bachelor's degree in Construction Management, Engineering, Quantity Surveying, or a related field preferred.
- Significant experience in electrical estimating, cost management, quantity surveying, or preconstruction services.
- Data center, mission-critical, semiconductor, advanced manufacturing, or industrial project experience strongly preferred.
- Experience estimating large-scale electrical construction packages and critical power infrastructure required.
- Professional certifications such as CCP, CEP, CPE, PQS, MRICS, or similar are a plus.
Additional Information
*On-site presence and requirements may change depending on our client's needs.
The salary range for this role is $100,000-$170,000 USD. This range reflects the company's good faith estimate of the base salary for this position at the time of the posting. Final compensation will be determined based on factors including experience, skills, qualifications, and internal equity. In addition to base salary, employees may be eligible for bonuses and a comprehensive benefits package.
Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.
We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.
Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.
Please find out more about us at www.turnerandtownsend.com/ and https://www.heery.com/
All your information will be kept confidential according to EEO guidelines.
Join our social media conversations for more information about Turner & Townsend and our exciting future projects:
It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.
Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.
Source: Turner & Townsend on SmartRecruiters · View original posting (opens in new tab)
How this pay compares
Base floor $100,000. The employer's range is $70,000 wide, 70% of the floor. Observed open for 3 days so far (since Nov 17, 2026).
How Turner & Townsend pays
This is the lowest base floor among Turner & Townsend's 264 live roles on this site (shared with 20 others). Across them the median floor is $137,500; the middle half runs from $120,000 to $150,000.
Base floors of Turner & Townsend's 264 live roles
Table
| Floor band | Share | Roles |
|---|---|---|
| $100K to $125K | 26.9% | 71 |
| $125K to $150K | 44.7% | 118 |
| $150K to $175K | 22.0% | 58 |
| $175K to $200K | 5.3% | 14 |
| $200K to $225K | 0.8% | 2 |
| $225K to $250K | 0.0% | 0 |
| $250K to $275K | 0.4% | 1 |
How this is calculated
- Statistic
- Employer base floor distribution
- Formula
- count of the employer's open roles in each $25K band of published base floor / its open roles
- Denominator
- 264 open public roles at this employer
- Sample size
- 264
- Hidden when
- this employer has fewer than 5 roles
- Calculation version
- jobpage-analysis-v1
- Data as of
- current
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
This listingSenior Electrical Cost Estimator - Data Center Construction$100K – $170K
Project Manager - Retail Construction$100K – $140K
Cost Analyst - Renewables Construction$100K – $130K
Architectural Design Coordinator - EV Construction$100K – $130K
Cost Manager / Quantity Surveyor - Construction Management$100K – $130K
Associate Program Manager - Data Center Construction$100K – $130K
Project Manager – Construction Management (Anticipated Opening)$100K – $140K
Chart as a table
| Role | Published base |
|---|---|
| Senior Electrical Cost Estimator - Data Center Construction (this listing) | $100K - $170K |
| Project Manager - Retail Construction | $100K - $140K |
| Cost Analyst - Renewables Construction | $100K - $130K |
| Architectural Design Coordinator - EV Construction | $100K - $130K |
| Cost Manager / Quantity Surveyor - Construction Management | $100K - $130K |
| Associate Program Manager - Data Center Construction | $100K - $130K |
| Project Manager – Construction Management (Anticipated Opening) | $100K - $140K |
Observed changes
No changes to the pay or listing since we first observed this role on Nov 17, 2026 (3 days ago).
- First observed on the employer's board, already publishing a qualifying base salary
- Observed since
- Employer-stated posting date
- 2026-11-17
Where this pay comes from
Location as the employer wrote it: San Francisco, California, United States (remote)
The salary range for this role is $100,000-$170,000 USD. This range reflects the company's good faith estimate
- Method
- Employer text, read with fixed rules and re-verified
- Checked
- Rule set
- us-base-v2
The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.
What we verified
- The pay figures come from the employer's own listing, quoted exactly above.
- The pay is an annual base salary in US dollars with a minimum of at least $100,000.
- The role was publicly listed on the employer's job board when last checked.
We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.
