Six Figure Work

Senior Electrical Estimator - Data Center Construction

Turner & Townsend

Company websiteturnerandtownsend.com (Turner & Townsend, opens in new tab)

Base salary $130K  to $170K

Employer-published annual base salary, USD. Advertised base range in United States

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationUnited States
  • WorkplaceRemote
  • Status at last checkSource accepting applications when checked
  • Last checked (51 min ago) · observed since

About this job

Company Description


Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries. 

Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people’s lives. Working in partnership makes it possible to deliver the world’s most impactful projects and programmes as we turn challenge into opportunity and complexity into success. 

Our capabilities include programme, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions. 

We are majority-owned by CBRE Group, Inc., the world’s largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier programme, project and cost management offering in markets around the world. 

Job Description


Turner & Townsend is seeking an experienced Senior Electrical Estimator to support the delivery of large‑scale, mission‑critical data center programs. This role is central to the commercial planning and execution of hyperscale facilities, where electrical infrastructure represents a significant portion of total project cost, schedule risk, and operational performance.

The Senior Electrical Estimator will lead the development of detailed electrical estimates for power distribution, backup generation, and critical systems, providing commercial and technical leadership throughout the project lifecycle. This role works closely with engineering, construction, and procurement teams and requires strong technical expertise, sound estimating judgment, and experience in fast‑paced, standardized delivery environments.

Candidates for this role must be physically based in the United States and legally authorized to work in the U.S. Remote work is permitted only from within the United States; candidates located outside the U.S. cannot be considered for remote employment.

 

Responsibilities:

  • Lead the preparation of detailed electrical cost estimates for hyperscale data center projects, including medium‑ and low‑voltage distribution, substations, UPS systems, generators, switchgear, busway, grounding, and lighting systems.
  • Perform and oversee comprehensive electrical quantity takeoffs from drawings, specifications, and BIM models, including conduit, cabling, transformers, generators, and associated infrastructure.
  • Develop, validate, and challenge labor, material, and equipment pricing models aligned with project budgets, delivery strategies, and evolving market conditions.
  • Establish and maintain historical cost data, benchmarks, and estimating standards to support large‑scale programs and future project forecasting.
  • Review, analyze, and normalize electrical contractor and subcontractor bids, identifying scope gaps, cost risks, and commercial exposure.
  • Lead and support value engineering and design optioneering efforts, evaluating alternative electrical systems, layouts, and installation methods while maintaining redundancy and reliability requirements.
  • Partner closely with engineering, procurement, and construction leaders to inform electrical system decisions based on cost, constructability, schedule, and risk.
  • Identify and proactively manage risks related to long‑lead electrical equipment, supply chain constraints, labor availability, and market escalation.
  • Account for regional cost variability across U.S. markets, including labor rates, logistics constraints, permitting considerations, and utility interface requirements.
  • Support estimating for large‑scale power infrastructure, including utility tie‑ins, substations, and campus‑wide electrical distribution.
  • Contribute to standardized data center designs and repeatable delivery models, improving cost certainty, scalability, and speed to market.
  • Ensure electrical estimates align with applicable codes, safety standards, sustainability objectives, and energy efficiency requirements.
  • Prepare clear, defensible estimating deliverables and present findings to internal teams and external stakeholders.
  • Participate in cost reviews, procurement discussions, funding approvals, and commercial strategy sessions.
  • Support change management by assessing electrical scope changes and cost impacts throughout the design and construction lifecycle.
  • Provide estimating handover materials to construction teams to support alignment between estimate and execution.
  • Offer mentorship and technical guidance to junior estimators and contribute to estimating best practices.
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable.

Qualifications

  • Bachelor’s degree in Electrical Engineering, Construction Management, or a related discipline, or equivalent professional experience.
  • 7+ years of experience in electrical estimating, with strong preference for data center, mission‑critical, or large‑scale infrastructure projects.
  • Advanced technical knowledge of power distribution systems, backup generation, UPS systems, electrical codes, and labor productivity.
  • Demonstrated experience estimating high‑density and hyperscale electrical systems is highly desirable.
  • Proficiency in estimating and takeoff tools such as Accubid, ConEst, McCormick, Bluebeam, or similar platforms, with strong familiarity interpreting BIM‑based information.
  • Strong analytical and communication skills, with the ability to clearly articulate cost drivers, assumptions, and risks.
  • Proven ability to operate independently while providing leadership within a collaborative, multidisciplinary project environment.

Additional Information


*On-site presence and requirements may change depending on our client's needs.*

The base salary range for this full-time role is $130K-$170K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package.  Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications. 

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance. 

Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.

Please find out more about us at www.turnerandtownsend.com/

Turner & Townsend does not accept any speculative or unsolicited CV’s that have been sent to our internal recruitment team or hiring managers from agencies outside of our preferred supplier list or that have not followed due process. Any speculative or unsolicited CV’s will be treated as a direct application.


All your information will be kept confidential according to EEO guidelines.
 

#LI-MB1

Join our social media conversations for more information about Turner & Townsend and our exciting future projects: 

Twitter

Instagram

LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time. 

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review. 

Source: Turner & Townsend on SmartRecruiters · View original posting (opens in new tab)

Pay in context

This role's base floor ($130,000) is above 41% of the 3,392 Finance & Accounting roles nationwide listed on this site; 93 others list the same floor. Their median floor is $138,000; the middle half runs from $115,000 to $170,248.

Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 8, 2026.

This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
RolePublished base
Senior Electrical Estimator - Data Center Construction (this listing)$130K - $170K
Senior Construction Project Manager - Government$130K - $160K
Senior Construction Project Manager-K-12 Projects$130K - $150K
Senior Construction Project Manager- Federal Projects (Anticipated Opening)$130K - $180K
Senior Consultant - Procurement, Contracts and Supply Chain$130K - $165K
Senior Cost Manager / Quantity Surveyor - Commercial Real Estate$130K - $160K
Design Manager- Aviation Construction (Anticipated Opening)$130K - $175K

Same $100K to $400K scale as every card. All Turner & Townsend roles · How to read the bar

Observed changes

  1. First observed on the employer's board
  2. Began meeting the published-salary criteria
  3. fields changed
Observed since
Employer-stated posting date
2026-07-24
Where this pay comes from

Location as the employer wrote it: USA wide, United States (remote)

The base salary range for this full-time role is $130K-$170K per year. Ranges are determined by role and level and repre

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.

Get Six Figure Work by email

Pick what you want. Nothing is selected for you unless it matches the page you are on, and nothing is sent until you confirm from a link we email you.

What would you like to receive?

A short weekly note on what employer-published pay data shows: who pays what, where, and what is changing. Once a week.

Practical notes for job seekers: interviewing, applying for six-figure roles, and making an upward move. About twice a month.

New jobs that match a search you choose. Every job listed has an employer-published base salary of $100,000 or more. At most one email a day (or weekly, your choice). Nothing is sent on days with no new matches. Alerts cover every new job, because this page has no filters.

We email you only after you confirm from a link we send to this address. We do not sell or share your address. Every email has a one-click unsubscribe link. How we handle your email.