Construction Manager, Data Center Construction, Data Center Construction
Company websiteamazon.com (Amazon, opens in new tab)
Base salary $111,300 – $186,100
Employer-published annual base salary, USD. Advertised base range in Culpeper, VA
You apply on the employer's own site. Six Figure Work does not handle applications.
- LocationCulpeper, VA
- WorkplaceWorkplace not stated
- Status at last checkSource accepting applications when checked
- Last checked (5 h ago) · observed since
About this job
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we’re the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain — and we’re looking for talented people who want to help.
You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You’ll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you’ll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.
As a Data Center Construction Manager you will be a part of a creative, diverse team tasked with solving fascinating problems constructing Amazon Data Centers. Our data centers are industry-leading examples of energy efficient, cost-effective designs. You will work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers.
As our Data Center Construction Manager, you will build some of the most interesting electrical and mechanical systems in the world. You will be on the construction site daily interacting with the construction trades, as Amazon’s owner’s representative and be directly responsible for driving cost, schedule, and quality while managing construction vendors and contractors building data centers.
At Amazon, we are all Owners and leverage unique opportunities presented to us by owning everything from the design review to construction bidding to construction execution and final hand-off to our customers. We are a diverse, upbeat, creative, team of engineers and managers working on a daily basis to develop innovative data centers for our Customers.
This position requires that the candidate selected be a US Citizen.
Key job responsibilities
The Data Center Construction Manager will be responsible for construction project management and oversight of construction related activities as they relate to new builds or general capital projects which includes the ownership of the project scope, quality, schedule, and budget. Some of the typical daily tasks of the Construction Manager:
Direct interface with construction general contractors during the bidding, award, execution, and project closeout/punch list phases.
Conduct negotiations with general contractors and evaluate bids/proposals with detail and accuracy.
Create construction project scope and request for proposals.
Financial analysis of construction.
Construction project management for specific initiatives aimed at increasing the resiliency of our data centers.
Constructability reviews of electrical and mechanical designs associated with the construction of new data centers or optimization of existing data centers.
Construction document management including submittal review, RFI’s, change orders, and invoicing.
Construction project quality control.
Record and report key construction metrics to team members and management.
Drive teams to perform troubleshooting and root-cause failure analysis associated with equipment failures.
Be a leader within the group as well as within internal and external teams that support the data center.
About the team
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we’re the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain — and we’re looking for talented people who want to help.
You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You’ll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you’ll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.
Amazon Web Services (AWS) is the world’s most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating — that’s why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses.
Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn’t followed a traditional path, or includes alternative experiences, don’t let it stop you from applying.
We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there’s nothing we can’t achieve in the cloud.
Here at AWS, it’s in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon conferences, inspire us to never stop embracing our uniqueness.
We’re continuously raising our performance bar as we strive to become Earth’s Best Employer. That’s why you’ll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional.
Basic Qualifications
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field
- Experience carrying new design concepts through exploration, development, and into deployment or mass production
- Experience in MS Excel, Word, and Windows Operating Systems
- Experience with power management and power monitoring systems
Preferred Qualifications
- 5+ years of project management in data centers or comparable critical infrastructure experience
- Knowledge of critical data center equipment
- Knowledge of engineering documentation, electrical diagrams and standard operating procedures
- Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, or OSHA
- Experience in project management in data centers or comparable critical infrastructure
- Experience in Data Center Engineering Operations, with a deep understanding of electrical and mechanical data center infrastructure
- Experience reading and interpreting construction specifications and drawings for all domains
Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status.
Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information. If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner.
The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at https://amazon.jobs/en/benefits.
USA, VA, Culpeper - 111,300.00 - 186,100.00 USD annually
Source: Amazon · View original posting (opens in new tab)
How this pay compares
Base floor $111,300, above 10% of the 237 Engineering (non-software) roles in Virginia on this site; the other 90% list the same floor or a higher one. The employer's range is $74,800 wide, 67% of the floor. Observed open for 17 days so far (since Nov 3, 2026).
Pay in context
Among 237 Engineering (non-software) roles in Virginia listed on this site, the median base floor is $122,000 and the middle half runs from $111,300 to $136,600. This role's floor ($111,300) is above 10% of them; 37 others list the same floor.
Base floors of 237 Engineering (non-software) roles in Virginia
Table
| Floor band | Share | Postings |
|---|---|---|
| $100K to $125K | 50.6% | 120 |
| $125K to $150K | 35.9% | 85 |
| $150K to $175K | 7.2% | 17 |
| $175K to $200K | 3.0% | 7 |
| $200K to $225K | 2.5% | 6 |
| $225K to $250K | 0.0% | 0 |
| $250K to $275K | 0.4% | 1 |
| $275K and up | 0.4% | 1 |
How this is calculated
- Statistic
- Base floor distribution of the cohort
- Formula
- count of cohort postings in each $25K band of published base floor / postings in the cohort
- Denominator
- 237 open postings with this job family in Virginia
- Sample size
- 237
- Hidden when
- the cohort has fewer than 30 postings
- Calculation version
- jobpage-analysis-v1
- Data as of
- 2026-11-21
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 21, 2026.
State against nationwide
Median base floor in Virginia vs nationwide
Table
| Value | postings | |
|---|---|---|
| Engineering (non-software), Virginia | $122K | 237 |
| Engineering (non-software), all states | $136K | 7,592 |
| This job's base floor (marked) | $111,300 |
How this is calculated
- Statistic
- Median floor, state vs nationwide
- Formula
- median published base floor of each cohort
- Denominator
- open postings of this job family
- Sample size
- 237 in Virginia; 7592 nationwide
- Hidden when
- either cohort has fewer than 30 postings
- Calculation version
- jobpage-analysis-v1
- Data as of
- 2026-11-21
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
How Amazon pays
3,898 of Amazon's 4,159 live roles on this site list a higher base floor and 134 list a lower one. Across them the median floor is $143,700; the middle half runs from $131,300 to $159,300.
Base floors of Amazon's 4,159 live roles
Table
| Floor band | Share | Roles |
|---|---|---|
| $100K to $125K | 17.3% | 720 |
| $125K to $150K | 46.1% | 1,919 |
| $150K to $175K | 22.9% | 953 |
| $175K to $200K | 11.6% | 484 |
| $200K to $225K | 1.6% | 67 |
| $225K to $250K | 0.2% | 8 |
| $250K to $275K | 0.1% | 6 |
| $275K and up | <0.1% | 2 |
How this is calculated
- Statistic
- Employer base floor distribution
- Formula
- count of the employer's open roles in each $25K band of published base floor / its open roles
- Denominator
- 4,159 open public roles at this employer
- Sample size
- 4159
- Hidden when
- this employer has fewer than 5 roles
- Calculation version
- jobpage-analysis-v1
- Data as of
- current
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
Similar pay elsewhere
Other employers' Engineering (non-software) roles in Virginia with the nearest published base floor to $111,300, one per employer.
- ECM/cUAS Field Services Engineer - Northern VA (VAXCOM) Parsons · base floor $112,200
- Senior Project Engineer - Bridge Design HNTB · base floor $110,385
- Sr. Facilities Project Engineer - HSC Howmet · base floor $110,000
- RF Engineer Amentum · base floor $110,000
- Systems Engineers L1-6 Core One · base floor $110,000
This listingConstruction Manager, Data Center Construction, Data Center Construction$111,300 – $186,100
Senior Business Coach, Delivery Service Partner Program$110,200 – $149,100
Regional Construction Manager, GES NA, Startup Engineering Risk Management (ERM)From $109,800
Robotics Maintenance Technician, Frontier AI & Robotics (FAR)$110,400 – $191,200
Robotics Data Engineer, Frontier AI & Robotics (FAR)$110,400 – $191,200
Project Engineer$110,400 – $191,200
Software Development Engineer, Bespoke Solutions; ADC Hardware & Software Team$110,500 – $160,000
Chart as a table
| Role | Published base |
|---|---|
| Construction Manager, Data Center Construction, Data Center Construction (this listing) | $111,300 - $186,100 |
| Senior Business Coach, Delivery Service Partner Program | $110,200 - $149,100 |
| Regional Construction Manager, GES NA, Startup Engineering Risk Management (ERM) | From $109,800 |
| Robotics Maintenance Technician, Frontier AI & Robotics (FAR) | $110,400 - $191,200 |
| Robotics Data Engineer, Frontier AI & Robotics (FAR) | $110,400 - $191,200 |
| Project Engineer | $110,400 - $191,200 |
| Software Development Engineer, Bespoke Solutions; ADC Hardware & Software Team | $110,500 - $160,000 |
Observed changes
No changes to the pay or listing since we first observed this role on Nov 3, 2026 (17 days ago).
- First observed on the employer's board, already publishing a qualifying base salary
- Observed since
- Employer-stated posting date
- 2026-03-19
Where this pay comes from
Location as the employer wrote it: US, VA, Culpeper
USA, VA, Culpeper - 111,300.00 - 186,100.00 USD annually
- Method
- Employer text, read with fixed rules and re-verified
- Checked
- Rule set
- us-base-v2
The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.
What we verified
- The pay figures come from the employer's own listing, quoted exactly above.
- The pay is an annual base salary in US dollars with a minimum of at least $100,000.
- The role was publicly listed on the employer's job board when last checked.
We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.
