Six Figure Work

Senior / Associate Director - Construction Scheduler

Turner & Townsend

Company websiteturnerandtownsend.com (Turner & Townsend, opens in new tab)

Base salary $150K  to $200K

Employer-published annual base salary, USD. Advertised base range in New York, NY

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationNew York, NY
  • WorkplaceWorkplace not stated
  • Status at last checkSource accepting applications when checked
  • Last checked (2 min ago) · observed since

About this job

Company Description

Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries. 

Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people’s lives. Working in partnership makes it possible to deliver the world’s most impactful projects and programmes as we turn challenge into opportunity and complexity into success. 

Our capabilities include programme, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions. 

We are majority-owned by CBRE Group, Inc., the world’s largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier programme, project and cost management offering in markets around the world. 

Job Description

Turner & Townsend is seeking an experienced Senior to Associate Director level Scheduler to join our team to support scheduling as a project controls function on a large-scale project. The ideal individual will have a proven track record of successfully delivering construction project control services. 

Responsibilities:

  • Develop, maintain, and update project Integrated Master Schedules (IMS) and establish scheduling management processes, standards, and deliverables for large-scale capital programs.
  • Prepare and maintain baseline schedules, schedule basis documents, and integrated schedules by consolidating contractor schedules and ensuring alignment with project requirements and objectives.
  • Review, analyze, and validate contractor schedules for logic, constructability, contractual compliance, schedule quality, resource loading/leveling, and overall schedule integrity.
  • Monitor project performance through schedule health assessments, critical path and near-critical path analysis, schedule variance tracking, trending, and scenario planning; recommend and support corrective actions when required.
  • Facilitate schedule reviews and workshops with project teams, contractors, clients, and stakeholders to ensure accurate, timely, and credible schedule information is incorporated and maintained.
  • Apply Earned Value Management (EVM) methodologies, perform schedule analytics, and prepare periodic progress reports, dashboards, trend analyses, and executive-level schedule communications.
  • Maintain records of scope changes, trends, risks, assumptions, and variances that may impact schedule performance, and assess associated impacts to project delivery.
  • Serve as a trusted advisor to project stakeholders, clients, and consultants by providing scheduling expertise, strategic guidance, and recommendations throughout all phases of the project lifecycle.
  • Perform Quantitative Risk Analysis (QRA) and other schedule risk assessments at key project milestones to evaluate schedule uncertainty and support informed decision-making.
  • Execute SOX control responsibilities and maintain compliance with applicable governance, regulatory, and organizational requirements.

Qualifications

  • Bachelor’s degree in construction management, cost management, quantity surveying, engineering or field related to construction.
  • Minimum 7 years of applicable experience.
  • Direct experience working on teams within a complex matrix environment. 
  • Expertise using Primavera P6. 
  • Excellent communication skills.
  • Experience developing level 3 and level 4 construction schedules.
  • Certification Requirements: Planning and Scheduling Professional (PSP).
  • Expertise using Oracle Primavera Cloud, Microsoft Project, and Smartsheets (preferred).

Additional Information

The salary range for this full-time role is $150K-$200K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package.  Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications. 

*On-site presence and requirements may change depending on our client's needs*

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.

Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.

Please find out more about us at www.turnerandtownsend.com/ and https://www.heery.com/

All your information will be kept confidential according to EEO guidelines.

#LI-AM1

Join our social media conversations for more information about Turner & Townsend and our exciting future projects: 

Twitter

Instagram

LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time. 

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review. 

Source: Turner & Townsend on SmartRecruiters · View original posting (opens in new tab)

Pay in context

This role's base floor ($150,000) is above 56% of the 322 Program & Project Management roles in New York listed on this site; 19 others list the same floor. Their median floor is $140,000; the middle half runs from $117,444 to $166,000.

Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 7, 2026.

This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
RolePublished base
Senior / Associate Director - Construction Scheduler (this listing)$150K - $200K
Data Center Mechanical Construction Program Manager- Technical MEP projects (Remote)$150K - $175K
Project Manager/ Pre-Construction Manager (Anticipated Opening)$150K - $180K
Senior Design Execution Project Manager$150K - $175K
Senior Project Manager (Corporate TI/Fit Out) – Construction Management$150K - $180K
Associate Director Project Manager - Retail Construction$150K - $180K
Senior Scheduler$150K - $180K

Same $100K to $400K scale as every card. All Turner & Townsend roles · How to read the bar

Observed changes

  1. First observed on the employer's board
  2. fields changed
  3. Began meeting the published-salary criteria
Observed since
Employer-stated posting date
2026-07-08
Where this pay comes from

Location as the employer wrote it: New York, NEW YORK, United States

The salary range for this full-time role is $150K-$200K per year. Ranges are determined by role and level and repre

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.

Get Six Figure Work by email

Pick what you want. Nothing is selected for you unless it matches the page you are on, and nothing is sent until you confirm from a link we email you.

What would you like to receive?

A short weekly note on what employer-published pay data shows: who pays what, where, and what is changing. Once a week.

Practical notes for job seekers: interviewing, applying for six-figure roles, and making an upward move. About twice a month.

New jobs that match a search you choose. Every job listed has an employer-published base salary of $100,000 or more. At most one email a day (or weekly, your choice). Nothing is sent on days with no new matches. Alerts cover every new job, because this page has no filters.

We email you only after you confirm from a link we send to this address. We do not sell or share your address. Every email has a one-click unsubscribe link. How we handle your email.