Six Figure Work

Senior Construction Scheduler - Data Centers

Turner & Townsend

Company websiteturnerandtownsend.com (Turner & Townsend, opens in new tab)

Base salary $140K  to $170K

Employer-published annual base salary, USD. Advertised base range in San Jose, CA

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationSan Jose, CA
  • WorkplaceWorkplace not stated
  • Status at last checkSource accepting applications when checked
  • Last checked (42 min ago) · observed since

About this job

Company Description

Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries. 

Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people’s lives. Working in partnership makes it possible to deliver the world’s most impactful projects and programs as we turn challenge into opportunity and complexity into success. 

Our capabilities include program, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions. 

We are majority-owned by CBRE Group, Inc., the world’s largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier program, project and cost management offering in markets around the world. 

Job Description

Turner & Townsend is seeking an experienced Senior Scheduler to join our team to support scheduling as a project controls function on a large-scale project. The ideal individual will have a proven track record of successfully delivering construction project control services.   

Responsibilities:

  • Develop, manage, and maintain comprehensive integrated master schedules for data center projects from pre-construction through construction hand-off.
  • Collaborate with project managers, engineers, procurement, cost managers, and trade partners to gather input, validate sequencing, and ensure schedule feasibility.
  • Create and update multiple schedules for a variety of potential scopes for any given project, until lease signing.
  • Conduct detailed schedule analysis to identify potential risks, delays, and opportunities for acceleration or optimization.
  • Proactively implement recovery strategies and mitigation plans to maintain project milestones and contractual obligations.
  • Facilitate and lead schedule review meetings, presenting updates, forecasts, and critical path analyses to internal and external stakeholders.
  • Establish, track, and report on key performance indicators (KPIs) to monitor project health, progress trends, and forecasting accuracy.
  • Integrate subcontractor and vendor schedules into the master project schedule, ensuring alignment with overall project objectives.
  • Support project controls functions including progress measurement, earned value analysis, and delay impact assessments.
  • Provide schedule input for change orders, scope modifications, and claims analysis, ensuring accurate documentation and justification.
  • Help establish and ensure adherence to client’s scheduling standards, tools, and best practices, contributing to continuous improvement initiatives.
  • Assist client with transition from Microsoft Project to P6 EPPM scheduling tools.
  • Support a dynamic and flexible client team that is on the cutting edge of data center development.
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable.

Qualifications

  • Bachelor’s degree in Construction Management, Engineering, or a related field; equivalent experience may be considered.
  • Proficiency in scheduling software, specifically Primavera P6 and knowledge of Microsoft Project,
  • Strong understanding of preconstruction and construction sequencing, work breakdown structures, critical path method (CPM,) and best scheduling practices.
  • Experience with data center construction or mission-critical infrastructure projects is highly preferred.
  • Familiarity with Power BI, Excel, and other reporting tools for KPI tracking and dashboard creation.
  • Ability to read and interpret construction drawings and specifications preferred.
  • Excellent communication, collaboration, and stakeholder management skills.

Preferred Qualifications

  • 7+ years of experience in project scheduling, with at least 3 years in a senior or lead role.
  • Experience working in fast-paced, high-tech environments with aggressive timeliness.
  • PMP, AACE PSP, PMI-SP, or equivalent certification is a plus.

Additional Information

The salary range for this full-time role is $140K-$170K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package.  Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications.

*On-site presence and requirements may change depending on our client's needs.

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.

Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.

Please find out more about us at www.turnerandtownsend.com/ and https://www.heery.com/

All your information will be kept confidential according to EEO guidelines.

Join our social media conversations for more information about Turner & Townsend and our exciting future projects: 

Twitter

Instagram

LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time. 

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review. 

Source: Turner & Townsend on SmartRecruiters · View original posting (opens in new tab)

Pay in context

This role's base floor ($140,000) is above 38% of the 754 Program & Project Management roles in California listed on this site; 24 others list the same floor. Their median floor is $150,000; the middle half runs from $125,300 to $176,400.

Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 7, 2026.

This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
RolePublished base
Senior Construction Scheduler - Data Centers (this listing)$140K - $170K
Construction Program Manager - K-12 Projects$140K - $165K
Infrastructure Senior Project Manager$140K - $155K
Associate Director Scheduler Lead - Data Center Construction$140K - $1.2M
Senior Estimator - Life Sciences$140K - $170K
Senior Construction Project Manager – TI / Fit Out$140K - $170K
Senior Scheduler - Data Center Construction$140K - $200K

Same $100K to $400K scale as every card. All Turner & Townsend roles · How to read the bar

Observed changes

  1. First observed on the employer's board
  2. fields changed
  3. Began meeting the published-salary criteria
Observed since
Employer-stated posting date
2026-10-09
Where this pay comes from

Location as the employer wrote it: San Jose, California, United States

The salary range for this full-time role is $140K-$170K per year. Ranges are determined by role and level and repre

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.