Senior Scheduler - Data Center Construction
Company websiteturnerandtownsend.com (Turner & Townsend, opens in new tab)
Base salary $140K to $200K
Employer-published annual base salary, USD. Advertised base range in United States
You apply on the employer's own site. Six Figure Work does not handle applications.
- LocationUnited States
- WorkplaceRemote
- Status at last checkSource accepting applications when checked
- Last checked (47 min ago) · observed since
About this job
Company Description
Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries.
Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people’s lives. Working in partnership makes it possible to deliver the world’s most impactful projects and programs as we turn challenge into opportunity and complexity into success.
Our capabilities include program, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions.
We are majority-owned by CBRE Group, Inc., the world’s largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier program, project and cost management offering in markets around the world.
Job Description
Turner & Townsend is seeking a Senior Construction Scheduler to join our Data Center team based in the U.S. and support the successful delivery of complex data center construction projects across the United States. This role will contribute to the planning, scheduling, and execution of mission-critical facilities, including new builds, expansions, and retrofit work.
The Senior Scheduler will collaborate with project teams, contractors, clients, and key stakeholders to develop, maintain, and analyze integrated project schedules throughout the project lifecycle. The ideal candidate will have expertise in scheduling, project controls, schedule risk analysis, and resource planning, with the ability to effectively support project performance, identify risks and opportunities, and deliver high-quality scheduling services in a client-facing environment.
Remote work flexibility is provided for this role, however, projects may require periodic travel and onsite support, typically 25-50% of the time depending on project needs. We strive to provide flexibility and will work with employees to accommodate reasonable travel preferences and geographic considerations whenever feasible.
Candidates for this role must be physically based in the United States and legally authorized to work in the U.S. Remote work is permitted only from within the United States; candidates located outside the U.S. cannot be considered for remote employment.
Responsibilities:
- Travel to project sites as needed to support project delivery and schedule management activities.
- Collaborate effectively with clients, project managers, design teams, contractors, subcontractors, and other stakeholders.
- Develop, maintain, and analyze detailed project and program schedules using Primavera P6 within a multi-project environment.
- Integrate schedule information from engineering, procurement, manufacturing, logistics, and construction teams into master program schedules.
- Support implementation of project planning and scheduling standards, processes, and best practices across data center construction programs.
- Partner with project and construction teams to maintain schedule integrity and ensure alignment with project objectives and milestones.
- Monitor schedule performance, progress updates, and forecasting to identify potential delays, constraints, and recovery opportunities.
- Coordinate and consolidate multiple sources of schedule data into integrated reporting platforms and program-level dashboards.
- Prepare and deliver project status reports, schedule narratives, and executive-level presentations for internal and client stakeholders.
- Generate and maintain milestone schedules and short-term look-ahead schedules to support project execution and decision-making.
- Perform schedule risk assessments, critical path analysis, and what-if scenario modeling to evaluate project impacts.
- Analyze schedule variances against baseline plans and provide recommendations for corrective actions and recovery strategies.
- Evaluate schedule impacts related to scope changes, design revisions, procurement activities, and change orders.
- Facilitate schedule review meetings and work closely with project teams to proactively resolve scheduling challenges.
- Support project controls reporting and governance requirements, including compliance with applicable company and client standards.
- SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
Qualifications
- Experience working in mission critical environments is preferred including commissioning activities.
- Construction experience- i.e. “boots on the ground.” This is site-level construction experience who knows the construction process.
- Understanding of best practice relating to the delivery of a construction program is required.
- Extensive experience creating and managing large-scale construction schedules in Primavera P6.
- A background in Project Controls is beneficial.
- Familiarity with construction drawings, specifications and construction sequencing is required.
- Being able to work independently is crucial.
- Capable of producing detailed concept level schedules from limited project information. Identifying major phases through that timeline and be able to determine and discuss dependencies.
- Working closely with various disciplines in project teams to ensure the accuracy and completeness of the schedules produced without compromising your independence as a scheduler so you are in a position to advise project management on issues requiring judgment.
- Knowledge of system start-up sequences and major dependencies.
- Able to convert data into Tableau reports and graphics.
- Excellent collaboration and communication skills are required.
- BS Degree in Engineering or Business or related field; or demonstrated equivalent and related experience.
- PSP certification by AACE in planning/scheduling is beneficial.
- EIT certification Preferred.
Additional Information
*On-site presence and requirements may change depending on our client's needs.
The base salary range for this role is $140K-$200K USD. This range reflects the company's good faith estimate of the base salary for this position at the time of the posting. Final compensation will be determined based on factors including experience, skills, qualifications, and internal equity. In addition to base salary, employees may be eligible for bonuses and a comprehensive benefits package.
Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.
We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance.
Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.
Please find out more about us at www.turnerandtownsend.com/ and www.heery.com/
All your information will be kept confidential according to EEO guidelines.
Join our social media conversations for more information about Turner & Townsend and our exciting future projects:
It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time.
Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review.
Source: Turner & Townsend on SmartRecruiters · View original posting (opens in new tab)
Pay in context
This role's base floor ($140,000) is above 68% of the 144 Administrative & Clerical roles nationwide listed on this site; 16 others list the same floor. Their median floor is $120,000; the middle half runs from $108,000 to $140,000.
Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 7, 2026.
This listingSenior Scheduler - Data Center Construction$140K to $200K
Construction Program Manager - K-12 Projects$140K to $165K
Infrastructure Senior Project Manager$140K to $155K
Associate Director Scheduler Lead - Data Center Construction$140K to $1.2M
Senior Estimator - Life Sciences$140K to $170K
Senior Construction Project Manager – TI / Fit Out$140K to $170K
MAC Program Lead$140K to $160K
Chart as a table
| Role | Published base |
|---|---|
| Senior Scheduler - Data Center Construction (this listing) | $140K - $200K |
| Construction Program Manager - K-12 Projects | $140K - $165K |
| Infrastructure Senior Project Manager | $140K - $155K |
| Associate Director Scheduler Lead - Data Center Construction | $140K - $1.2M |
| Senior Estimator - Life Sciences | $140K - $170K |
| Senior Construction Project Manager – TI / Fit Out | $140K - $170K |
| MAC Program Lead | $140K - $160K |
Observed changes
- First observed on the employer's board
- fields changed
- Began meeting the published-salary criteria
- Observed since
- Employer-stated posting date
- 2026-07-30
Where this pay comes from
Location as the employer wrote it: USA wide, United States (remote)
The base salary range for this role is $140K-$200K USD. This range reflects the company's good faith estimate
- Method
- Employer text, read with fixed rules and re-verified
- Checked
- Rule set
- us-base-v2
The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.
What we verified
- The pay figures come from the employer's own listing, quoted exactly above.
- The pay is an annual base salary in US dollars with a minimum of at least $100,000.
- The role was publicly listed on the employer's job board when last checked.
We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.
