Six Figure Work

Senior Program Risk Manager - Data Center Construction

Turner & Townsend

Company websiteturnerandtownsend.com (Turner & Townsend, opens in new tab)

Base salary $150K  to $170K

Employer-published annual base salary, USD. Advertised base range in United States

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationUnited States
  • WorkplaceRemote
  • Status at last checkSource accepting applications when checked
  • Last checked (43 min ago) · observed since

About this job

Company Description

Turner & Townsend is a global professional services company with over 22,000 people in more than 60 countries. 

Working with our clients across real estate, infrastructure, energy and natural resources, we transform together delivering outcomes that improve people’s lives. Working in partnership makes it possible to deliver the world’s most impactful projects and programmes as we turn challenge into opportunity and complexity into success. 

Our capabilities include programme, project, cost, asset and commercial management, controls and performance, procurement and supply chain, net zero and digital solutions. 

We are majority-owned by CBRE Group, Inc., the world’s largest commercial real estate services and investment firm, with our partners holding a significant minority interest. Turner & Townsend and CBRE work together to provide clients with the premier programme, project and cost management offering in markets around the world. 

Job Description

Turner & Townsend is looking for a Senior Risk Manager to join our growing team. The ideal individual will be an experienced risk professional that has supported large scale construction projects. 

Responsibilities:  

  • Develop, implement, and continuously improve Standard Operating Procedures (SOPs), risk frameworks, templates, and best practices to drive consistency and efficiency across the program. 
  • Conduct quantitative and qualitative risk assessments, including Monte Carlo simulations, Cost Risk Assessments (CRA), and Schedule Risk Assessments (SRA) to support contingency planning and schedule confidence analysis. 
  • Analyze project schedules to identify key schedule drivers, critical path risks, schedule uncertainty, and opportunities for schedule improvement. 
  • Perform Root Cause Analysis (RCA) on significant risk events, schedule impacts, and recurring program issues, identifying corrective and preventive actions. 
  • Support the establishment and maintenance of program-wide risk governance, ensuring consistency of risk processes, reporting, and controls across multiple projects. 
  • Maintain visibility of threat/opportunity trigger points to facilitate risk cost profiling, timely drawdown of risk budget or retirement of threat/opportunity.  
  • Monitor overall risk exposure and assess the remaining risk budget.  
  • Lead full risk workshop at construction kickoff ensuring integration with general contractor and client team 
  • Facilitate risk identification workshops with cross-functional stakeholders, e.g., contractor, engineering, construction, commissioning, procurement, project controls. 
  • Maintain the project risk register, ensuring risks are categorized, scored (likelihood x impact), and updated regularly. 
  • Initiate a proactive approach to the review, development and improvement of risk management services for the client.  
  • Undertake end-to-end project risk management practices on multiple projects/programs.  
  • Undertake the creation of risk management plans and processes in adherence to client requirements, processes, policies, and frameworks.  
  • Conduct risk reviews at regular intervals, identify and analyze, determine response plans, ensure that project and program risk profiles are being monitored and reported.  
  • Track mitigation actions, assign owners, and monitor progress through to closure. 
  • Establish integration of the risk management function within the program and project controls team, with direct touch points to cost and schedule management, change control, and reporting.  
  • Work proactively and collaboratively with program and project control teams to eliminate redundancies and identify improvement opportunities.  
  • Create value stream mapping to quantify pain points and develop solutions to minimize waste (both in terms of speed and cost).  
  • SOX control responsibilities may be part of this role, which are to be adhered to where applicable. 

Qualifications

  • College Degree in Business Administration, Construction Management, Engineering, Architecture.  
  • Experience and working in Project Management on large-scale construction programs.  
  • Experienced in Design/Architecture/Civil works.  
  • Solid working proficiency with AutoCAD, Revit, Bluebeam, and MS Office Suite.  
  • Excellent presentation skills and the ability to be highly effective in a client facing role.  
  • Team player; ability to work collaboratively.  

Additional Information

The salary range for this full-time role is $150K-$170K per year. Ranges are determined by role and level and represent a good faith effort to provide a fair and equitable salary. This range is a reflection of base salary only, not of a total compensation package.  Please note Turner & Townsend reserves the right to pay more or less than the posted range, depending on candidate’s experience and qualifications.  

*On-site presence and requirements may change depending on our clients' needs.*

Our inspired people share our vision and mission. We provide a great place to work, where each person has the opportunity and voice to affect change.

We want our people to succeed both in work and life. To support this we promote a healthy, productive and flexible working environment that respects work-life balance. 

Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.

Please find out more about us at www.turnerandtownsend.com/

Turner & Townsend does not accept any speculative or unsolicited CV’s that have been sent to our internal recruitment team or hiring managers from agencies outside of our preferred supplier list or that have not followed due process. Any speculative or unsolicited CV’s will be treated as a direct application.


All your information will be kept confidential according to EEO guidelines.
 

#LI-MK3

Join our social media conversations for more information about Turner & Townsend and our exciting future projects: 

Twitter

Instagram

LinkedIn

It is strictly against Turner & Townsend policy for candidates to pay any fee in relation to our recruitment process. No recruitment agency working with Turner & Townsend will ask candidates to pay a fee at any time. 

Any unsolicited resumes/CVs submitted through our website or to Turner & Townsend personal e-mail accounts, are considered property of Turner & Townsend and are not subject to payment of agency fees. In order to be an authorised Recruitment Agency/Search Firm for Turner & Townsend, there must be a formal written agreement in place and the agency must be invited, by the Recruitment Team, to submit candidates for review. 

Source: Turner & Townsend on SmartRecruiters · View original posting (opens in new tab)

This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Turner & Townsend roles with the nearest advertised base floor
RolePublished base
Senior Program Risk Manager - Data Center Construction (this listing)$150K - $170K
Data Center Mechanical Construction Program Manager- Technical MEP projects (Remote)$150K - $175K
Project Manager/ Pre-Construction Manager (Anticipated Opening)$150K - $180K
Senior Design Execution Project Manager$150K - $175K
Senior Project Manager (Corporate TI/Fit Out) – Construction Management$150K - $180K
Associate Director Project Manager - Retail Construction$150K - $180K
Senior Scheduler$150K - $180K

Same $100K to $400K scale as every card. All Turner & Townsend roles · How to read the bar

Observed changes

  1. First observed on the employer's board
  2. Began meeting the published-salary criteria
  3. fields changed
Observed since
Employer-stated posting date
2026-09-18
Where this pay comes from

Location as the employer wrote it: USA wide, United States (remote)

The salary range for this full-time role is $150K-$170K per year. Ranges are determined by role and level and repre

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.