Six Figure Work

Senior Project Manager - Data Center Construction

Cumming Group

Company websitecumming-group.com (Cumming Group, opens in new tab)

Base salary $115,700  to $180,567

Employer-published annual base salary, USD. Advertised base range in Edgerton, KS

This job is no longer listed by the employer as of Nov 5, 2026. It is no longer shown as accepting applications. The history below is kept for reference.

Similar open jobs

Browse all open jobs with published base pay of $100K or more

  • LocationEdgerton, KS
  • WorkplaceWorkplace not stated
  • Status at last checkClosed

View original posting on Workday (opens in new tab)

This range next to 6 other live Cumming Group roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Cumming Group roles with the nearest advertised base floor
RolePublished base
Senior Project Manager - Data Center Construction (this listing)$115,700 - $180,567
Senior Scheduler$115,100 - $153,500
Senior Cost Manager$115,100 - $153,500
Senior Cost Manager$115,100 - $153,500
Senior Project Manager - Data Center Construction$115,700 - $161,967
Associate Director, Scheduling$115,700 - $161,967
Senior QA/QC Manager - Data Center Construction$115,700 - $180,567

Same $100K to $400K scale as every card. All Cumming Group roles · How to read the bar

Observed changes

  1. First observed on the employer's board
  2. Began meeting the published-salary criteria
  3. Absent from the employer's board; confirmation pending
  4. Closure observed on Nov 5, 2026
Observed since
Employer-stated posting date
2026-10-19
Where this pay comes from

Location as the employer wrote it: Edgerton, KS

The salary range for this full-time role is $115,700.00-$180,566.70 per year. Ranges are determined based on the position, geog

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.