Six Figure Work

Service Delivery Manager - Data Center Construction

Cumming Group

Company websitecumming-group.com (Cumming Group, opens in new tab)

Base salary $121,200 – $169,667

Employer-published annual base salary, USD. Advertised base range in Atlanta, GA +1 more

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationAtlanta, GA +1 more
  • WorkplaceWorkplace not stated
  • Status at last checkSource accepting applications when checked
  • Last checked (2 h ago) · observed since
All places named
  • Atlanta, GA
  • Dallas, TX

About this job

At Cumming Group, you will work on some of the world's most exciting projects in a dynamic environment where your success is measured by the impact you make. We are one of the fastest-growing project and cost management consultancies in the United States, as reflected in our top 15 rankings in ENR. With over 70 offices globally, an extremely diverse project portfolio, and double-digit year-over-year revenue growth, the opportunities to make your mark are limitless!



Position Summary:

The Service Delivery Manager’s primary focus is the management of the end-to-end service installation experience for Edged’s data center customers ensuring seamless service availability and customer satisfaction. The Service Delivery Manager will take the lead role in managing installation projects associated with Edged’s delivery of interconnection, space, power and cooling products and other services. This role requires an in-depth knowledge of data center technology that enables understanding of the complexities of service delivery within a data center environment.

In this role, the Service Delivery Manager will need to ensure compliance with all Service Level Agreements “SLA” associated with project delivery timelines. The Service Delivery Manager acts as the primary bridge between customer team(s), internal team(s), vendors and business stakeholders. Creation and management of installation reports, inventory management, space management, power delivery management and interconnection asset management are all areas of focus for this role.

The Service Delivery Manager will work hand in hand with construction managers, contractors and other third party vendors to delivery services within the data center during both the data center construction phase and life cycle operational phase of the building and customer deployment.

Responsibilities

  • Act as the Subject Matter Expert for Edged product sets
  • Reviewing construction drawings and coordinating with design and construction team
  • Partner with Procurement and Operations to optimize service availability and delivery lead times
  • Manage the entire service delivery project from strategic planning to tactical activities including inventory and design management in operational systems
  • Manage relationships with external vendors, contractors and distributors
  • Work across functional teams to continually improve the customer experience
  • Ensure all projects and deliverables meet delivery timeline SLA’s
  • Coordinate and communicate effectively with customer’s, third party vendors, procurement, Platform Delivery and other business stakeholders
  • Develop and manage third party contracts and RFI’s which align with business and project needs
  • Develop and manage plans to remediate issues arising that pertain to assigned projects
  • Maintain a working knowledge of data center Mechanical, Electrical, Plumbing “MEP” and Networking and IT assets
  • Support infrastructure planning and capacity management
  • Constantly improve processes and procedures
  • Attend industry conferences as required
  • Work on multiple projects concurrently
  • Provide leadership related to performance management and team coordination
  • Manage installs of both air cooling and liquid cooling technologies
  • Manage financial details for projects
  • Confidently and effectively communicate at multiple organizational levels

Knowledge & Skills Required:

  • 6+ years of construction project management experience, including mission-critical or data center projects.
  • Proven experience managing projects through design, procurement, construction, commissioning, and closeout.
  • Knowledge of data center electrical, mechanical, and critical infrastructure systems.
  • Experience managing contractors, consultants, budgets, schedules, and stakeholder relationships.
  • Data center experience highly preferred.

Preferred Education and Experience:


Education: BS in Construction, Engineering, or related field

Experience: 8+ years experience in project management, preferably on data center builds.


#LI-VM1


Cumming Group is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is Cumming Group’s policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.

All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, Cumming Group complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.

The salary range for this full-time role is $121,200.00-$169,666.69 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. Cumming Group reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.

In addition to base salary, Cumming Group offers a comprehensive benefits package including:

  • Medical
  • Dental Insurance
  • Vision Insurance
  • 401(k)
  • 401(k) Matching
  • Paid Time Off
  • Paid Holidays
  • Short and long-term disability
  • Employee Assistance Program


#LI-VM1

Source: Cumming Group on Workday · View original posting (opens in new tab)

How this pay compares

Base floor $121,200, above 61% of the 36 Program & Project Management roles in Georgia on this site. The employer's range is $48,467 wide, 40% of the floor. Observed open for 17 days so far (since Nov 10, 2026).

Pay in context

Among 36 Program & Project Management roles in Georgia listed on this site, the median base floor is $118,800 and the middle half runs from $105,740 to $128,850. This role's floor ($121,200) is above 61% of them.

Base floors of 36 Program & Project Management roles in Georgia

Base floors of 36 Program & Project Management roles in Georgia$100K to $125K: 66.7% (24); $125K to $150K: 22.2% (8); $150K to $175K: 8.3% (3); $175K to $200K: 2.8% (1)0%20%40%60%80%67%10022%1258%1503%175This job $121K
Each bar counts postings on this site by published base floor, in $K. The marker is this job's floor.
Table
Base floors of 36 Program & Project Management roles in Georgia
Floor bandSharePostings
$100K to $125K66.7%24
$125K to $150K22.2%8
$150K to $175K8.3%3
$175K to $200K2.8%1
How this is calculated
Statistic
Base floor distribution of the cohort
Formula
count of cohort postings in each $25K band of published base floor / postings in the cohort
Denominator
36 open postings with this job family in Georgia
Sample size
36
Hidden when
the cohort has fewer than 30 postings
Calculation version
jobpage-analysis-v1
Data as of
2026-11-28
Employer set
Open jobs on this site that publish a base salary of $100,000 or more

Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 28, 2026.

State against nationwide

Median base floor in Georgia vs nationwide

Median published base floor of the same job family, in this state and across all states, next to this job's floor.
Table
Median base floor in Georgia vs nationwide
Valuepostings
Program & Project Management, Georgia$118,80036
Program & Project Management, all states$135,7003,699
This job's base floor (marked)$121,200
How this is calculated
Statistic
Median floor, state vs nationwide
Formula
median published base floor of each cohort
Denominator
open postings of this job family
Sample size
36 in Georgia; 3699 nationwide
Hidden when
either cohort has fewer than 30 postings
Calculation version
jobpage-analysis-v1
Data as of
2026-11-28
Employer set
Open jobs on this site that publish a base salary of $100,000 or more

How Cumming Group pays

67 of Cumming Group's 123 live roles on this site list a higher base floor and 55 list a lower one. Across them the median floor is $127,300; the middle half runs from $115,100 to $150,400.

Base floors of Cumming Group's 123 live roles

Base floors of Cumming Group's 123 live roles$100K to $125K: 45.5% (56); $125K to $150K: 28.5% (35); $150K to $175K: 25.2% (31); $175K to $200K: 0.0% (0); $200K to $225K: 0.8% (1)0%15%30%45%46%10028%12525%1500%175<1%200This job $121K
Each bar counts this employer's live roles by published base floor, in $K. The marker is this job's floor.
Table
Base floors of Cumming Group's 123 live roles
Floor bandShareRoles
$100K to $125K45.5%56
$125K to $150K28.5%35
$150K to $175K25.2%31
$175K to $200K0.0%0
$200K to $225K0.8%1
How this is calculated
Statistic
Employer base floor distribution
Formula
count of the employer's open roles in each $25K band of published base floor / its open roles
Denominator
123 open public roles at this employer
Sample size
123
Hidden when
this employer has fewer than 5 roles
Calculation version
jobpage-analysis-v1
Data as of
current
Employer set
Open jobs on this site that publish a base salary of $100,000 or more

Similar pay elsewhere

Other employers' Program & Project Management roles in Georgia with the nearest published base floor to $121,200, one per employer.

This range next to 6 other live Cumming Group roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Cumming Group roles with the nearest advertised base floor
RolePublished base
Service Delivery Manager - Data Center Construction (this listing)$121,200 - $169,667
Senior Project Manager$120,200 - $160,267
Project Manager$120,200 - $160,267
Senior Estimator - Life Science/Pharmaceutical Construction$120,200 - $181,733
Project Manager (Healthcare)$120,200 - $160,267
Senior Scheduler$120,200 - $160,267
Civil Engineer$120,200 - $160,267

Same $100K to $400K scale as every card. All Cumming Group roles · How to read the bar

Observed changes

  1. First observed on the employer's board, already publishing a qualifying base salary
  2. Advertised base range changed
  3. Listing details edited by the employer
Observed since
Employer-stated posting date
2026-11-20
Where this pay comes from

Location as the employer wrote it: Atlanta, GA • Dallas, TX

The salary range for this full-time role is $121,200.00-$169,666.69 per year. Ranges are determined based on the position, geog

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.

Get Six Figure Work by email

Pick what you want. Nothing is selected for you unless it matches the page you are on, and nothing is sent until you confirm from a link we email you.

What would you like to receive?

A short weekly note on what employer-published pay data shows: who pays what, where, and what is changing. Once a week.

Practical notes for job seekers: interviewing, applying for six-figure roles, and making an upward move. About twice a month.

New jobs that match a search you choose. Every job listed has an employer-published base salary of $100,000 or more. At most one email a day (or weekly, your choice). Nothing is sent on days with no new matches. Alerts cover every new job, because this page has no filters.

We email you only after you confirm from a link we send to this address. We do not sell or share your address. Every email has a one-click unsubscribe link. How we handle your email.