Site Logistic Project Manager - Data Center Construction
Company websitecumming-group.com (Cumming Group, opens in new tab)
Base salary $153,100 – $214,367
Employer-published annual base salary, USD. Advertised base range in Vernon, TX
You apply on the employer's own site. Six Figure Work does not handle applications.
- LocationVernon, TX
- WorkplaceWorkplace not stated
- Status at last checkSource accepting applications when checked
- Last checked (2 h ago) · observed since
About this job
World Wide Professional Solutions is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.
We are hiring a Site Logistics Project Manager to support a large-scale data center construction project in Vernon, Texas. This is a full-time, 100% onsite role based in Vernon, Texas.
This role will lead project site logistics for a major mission critical construction program. You will be responsible for planning, coordinating, and managing the physical flow of people, materials, equipment, temporary facilities, laydown areas, access routes, and site support infrastructure needed to keep a complex construction site moving safely and efficiently.
This is a high visibility owner’s rep role where you will act as an extension of the owner’s team, partnering closely with construction leadership, trade contractors, site operations, safety, quality, and project controls. You will have real ownership over site logistics strategy, not just coordination responsibility.
Wherever you are based, we provide full relocation or travel support including per diem, ensuring a smooth transition so you can hit the ground running from day one.
What Makes This Role Different
- Owner’s rep position with direct influence on site execution
- Large-scale, mission critical data center build with complex site logistics
- Leadership role focused on keeping the entire project site organized, safe, and productive
- Direct responsibility for laydown planning, access control, temporary facilities, and site infrastructure
- Fast-paced environment with real decision-making authority
- Full lifecycle exposure from early site planning through construction, commissioning, and turnover
What You Will Do
- Lead site logistics planning and execution for a large-scale data center construction project
- Manage complex project site material laydown areas, storage areas, staging plans, and site access routes
- Coordinate road improvements, haul routes, traffic flow, delivery sequencing, parking, and construction access needs
- Oversee temporary site facilities including trade lunch tents, workforce support areas, field offices, logistics zones, and related site infrastructure
- Coordinate logistics planning for concrete batch plants, heavy equipment movement, crane access, trucking, material deliveries, and high-volume construction activities
- Act as the primary logistics interface across owners, general contractors, trade partners, vendors, and project stakeholders
- Develop and maintain site logistics plans that support safety, schedule, productivity, and constructability
- Monitor site conditions and proactively resolve congestion, storage, sequencing, access, and coordination issues
- Partner with safety teams to ensure logistics activities support safe movement of people, materials, vehicles, and equipment
- Work closely with project controls and construction teams to align logistics planning with schedule milestones and construction sequencing
- Lead coordination meetings related to logistics, deliveries, site access, laydown, temporary facilities, and site constraints
- Support change management by identifying logistics impacts related to scope changes, schedule shifts, weather, workforce growth, or trade stacking
- Enforce site standards for housekeeping, material storage, access control, signage, traffic management, and logistics compliance
- Lead and mentor project team members and trade partners supporting logistics execution
What You Bring
- 3-5+ years of construction project management, logistics management, site operations, or field leadership experience
- Strong experience managing logistics on large-scale construction sites
- Background in data centers, mission critical, industrial, manufacturing, infrastructure, semiconductor, or other complex construction environments
- Proven ability to lead site logistics across multiple contractors, trades, vendors, and stakeholders
- Experience managing material laydown areas, storage yards, staging plans, delivery routes, temporary facilities, and site access plans
- Experience coordinating road improvements, haul routes, concrete batch plants, workforce support areas, parking, and site infrastructure is strongly preferred
- Strong understanding of construction sequencing, site constraints, field operations, safety requirements, and schedule impacts
- Ability to identify problems early and drive practical field solutions
- Strong leadership, communication, and stakeholder management skills
- Proficiency with Procore, Bluebeam, Primavera P6, MS Project, or similar construction management tools
Preferred Background
- Data center or mission critical construction experience strongly preferred
- Experience on projects exceeding $250M preferred
- Experience supporting owner’s rep, construction management, EPC, general contractor, or large trade contractor teams
- Bachelor’s degree in construction management, engineering, logistics, supply chain, or related field preferred
- OSHA, PMP, LEED, or similar certifications are a plus
World Wide Professional Solutions (WWPS) is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is WWPS' policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.
All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, WWPS complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.
The salary range for this full-time role is $153,100.00-$214,366.70 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. World Wide Professional Solutions reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.In addition to base salary, WWPS offers a comprehensive benefits package including:
- Medical
- Dental Insurance
- Vision Insurance
- 401(k)
- 401(k) Matching
- Paid Time Off
- Paid Holidays
- Short and long-term disability
- Employee Assistance Program
- Company-Paid Parental Leave
- State Paid Family and Medical Leave (where applicable)
- Lifestyle Spending Account (LSA)
- Professional Development & Tuition Assistance
#WWPS
#LI-PT1
Source: Cumming Group on Workday · View original posting (opens in new tab)
How this pay compares
Base floor $153,100, above 79% of the 190 Program & Project Management roles in Texas on this site. The employer's range is $61,267 wide, 40% of the floor. Observed open for 7 days so far (since Nov 21, 2026).
Pay in context
Among 190 Program & Project Management roles in Texas listed on this site, the median base floor is $127,100 and the middle half runs from $115,600 to $148,700. This role's floor ($153,100) is above 79% of them; 4 others list the same floor.
Base floors of 190 Program & Project Management roles in Texas
Table
| Floor band | Share | Postings |
|---|---|---|
| $100K to $125K | 46.3% | 88 |
| $125K to $150K | 30.5% | 58 |
| $150K to $175K | 15.8% | 30 |
| $175K to $200K | 5.8% | 11 |
| $200K to $225K | 1.6% | 3 |
How this is calculated
- Statistic
- Base floor distribution of the cohort
- Formula
- count of cohort postings in each $25K band of published base floor / postings in the cohort
- Denominator
- 190 open postings with this job family in Texas
- Sample size
- 190
- Hidden when
- the cohort has fewer than 30 postings
- Calculation version
- jobpage-analysis-v1
- Data as of
- 2026-11-28
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 28, 2026.
State against nationwide
Median base floor in Texas vs nationwide
Table
| Value | postings | |
|---|---|---|
| Program & Project Management, Texas | $127,100 | 190 |
| Program & Project Management, all states | $135,700 | 3,699 |
| This job's base floor (marked) | $153,100 |
How this is calculated
- Statistic
- Median floor, state vs nationwide
- Formula
- median published base floor of each cohort
- Denominator
- open postings of this job family
- Sample size
- 190 in Texas; 3699 nationwide
- Hidden when
- either cohort has fewer than 30 postings
- Calculation version
- jobpage-analysis-v1
- Data as of
- 2026-11-28
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
How Cumming Group pays
4 of Cumming Group's 123 live roles on this site list a higher base floor and 108 list a lower one. Across them the median floor is $127,300; the middle half runs from $115,100 to $150,400.
Base floors of Cumming Group's 123 live roles
Table
| Floor band | Share | Roles |
|---|---|---|
| $100K to $125K | 45.5% | 56 |
| $125K to $150K | 28.5% | 35 |
| $150K to $175K | 25.2% | 31 |
| $175K to $200K | 0.0% | 0 |
| $200K to $225K | 0.8% | 1 |
How this is calculated
- Statistic
- Employer base floor distribution
- Formula
- count of the employer's open roles in each $25K band of published base floor / its open roles
- Denominator
- 123 open public roles at this employer
- Sample size
- 123
- Hidden when
- this employer has fewer than 5 roles
- Calculation version
- jobpage-analysis-v1
- Data as of
- current
- Employer set
- Open jobs on this site that publish a base salary of $100,000 or more
Similar pay elsewhere
Other employers' Program & Project Management roles in Texas with the nearest published base floor to $153,100, one per employer.
- Transactions, Vice President Accordion · base floor $153,000
- Delivery Practice Manager, FedFin AWS · base floor $153,600
- Director, Customer Program Management GlobalFoundries · base floor $152,000
- Program Manager, Mission Package Integration Saronic · base floor $154,500
- Construction Manager Fluidstack · base floor $155,000
This listingSite Logistic Project Manager - Data Center Construction$153,100 – $214,367
Director of Cost Management - Semiconductor Construction$153,100 – $214,367
Construction Manager - Data Center$153,100 – $214,367
Wastewater Construction Manager (Data Center Construction)$153,100 – $214,367
Project Managers - Data Center Construction$153,100 – $214,367
Senior Project Manager, Utility Electrical$153,100 – $214,367
Construction Project Director$153,100 – $214,367
Chart as a table
| Role | Published base |
|---|---|
| Site Logistic Project Manager - Data Center Construction (this listing) | $153,100 - $214,367 |
| Director of Cost Management - Semiconductor Construction | $153,100 - $214,367 |
| Construction Manager - Data Center | $153,100 - $214,367 |
| Wastewater Construction Manager (Data Center Construction) | $153,100 - $214,367 |
| Project Managers - Data Center Construction | $153,100 - $214,367 |
| Senior Project Manager, Utility Electrical | $153,100 - $214,367 |
| Construction Project Director | $153,100 - $214,367 |
Observed changes
- First observed on the employer's board, already publishing a qualifying base salary
- Advertised base range changed
- Listing details edited by the employer
- Observed since
- Employer-stated posting date
- 2026-11-23
Where this pay comes from
Location as the employer wrote it: Vernon, TX
The salary range for this full-time role is $153,100.00-$214,366.70 per year. Ranges are determined based on the position, geog
- Method
- Employer text, read with fixed rules and re-verified
- Checked
- Rule set
- us-base-v2
The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.
What we verified
- The pay figures come from the employer's own listing, quoted exactly above.
- The pay is an annual base salary in US dollars with a minimum of at least $100,000.
- The role was publicly listed on the employer's job board when last checked.
We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.
