Six Figure Work

Manager of Construction, Data Center Construction

Amazon

Company websiteamazon.com (Amazon, opens in new tab)

Base salary $153,200  to $254,500

Employer-published annual base salary, USD. Advertised base range in New Carlisle, IN +1 more

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationNew Carlisle, IN +1 more
  • WorkplaceWorkplace not stated
  • Status at last checkSource accepting applications when checked
  • Last checked (4 h ago) · observed since
All places named
  • New Carlisle, IN
  • Hobart, IN

About this job

AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we’re the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain — and we’re looking for talented people who want to help.

You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You’ll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you’ll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.

As our Data Center Manager of Construction (CM MGR), you will be a part of a diverse, upbeat, and creative team tasked with solving fascinating problems constructing Amazon Data Centers. Our data centers are industry-leading examples of energy efficient and cost-effective designs.

You will:

  • Own project scope, quality, schedule, and budget for construction of new builds or general capital projects.
  • Own construction project management and oversight of construction related activities.
  • Work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers.
  • Be a leader in your specific discipline (construction management, building services, architectural, electrical or mechanical engineering).
  • Represent Amazon’s owner’s representative on construction sites daily, as, interacting with construction trades.

At Amazon, we are all Owners and leverage unique opportunities presented to us by owning everything from the design review to construction bidding, execution, and final hand-off to our customers. We develop innovative data centers for our Customers.

Key job responsibilities

  • Be Amazon’s construction representative on multiple data centers building and capital improvement construction project sites from construction start through hand-off to operations.
  • Direct interface with construction general contractors during the construction bidding, award, execution, punch-list, and closeout phases.
  • Create construction project Scope of Work (SOW) and Request for Proposals (RFP).
  • Conduct negotiations with general contractors and evaluate bids and proposals with detail and accuracy.
  • Manage and drive cost, schedule, and quality while managing construction contractors and vendors.
  • Perform construction project management activities, including management of documents, submittals, RFIs, change orders, invoices, quality, scope, and schedule.
  • Drive construction teams to troubleshoot and perform root-cause failure analysis on equipment failures.
  • Support commissioning and integrated system testing and oversight.
  • Support operations of installed facilities, including review of procedures, best practices, and maintenance initiatives.
  • Support capital request creation.
  • Analyze and report construction progress and financials.
  • Record and report key construction metrics to team members and management.
  • Contribute to construction initiatives aimed at improving construction efficiency and increasing data center resiliency.
  • Provide constructability reviews for civil, structural, electrical and mechanical designs for new or optimization of existing data centers.
  • Be a leader within the group, and within internal and external data center support teams.

A day in the life

Manage the day to day responsibilities of the CM team, engage with other internal AWS managers and team members. New Carlisle or Hobart, Indiana will be the permanent reporting location.

About the team

Diverse Experiences

Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn’t followed a traditional path, or includes alternative experiences, don’t let it stop you from applying.

Why AWS

Amazon Web Services (AWS) is the world’s most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating — that’s why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses.

Work/Life Balance

We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there’s nothing we can’t achieve in the cloud.

Inclusive Team Culture

Here at AWS, it’s in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon (gender diversity) conferences, inspire us to never stop embracing our uniqueness.

Mentorship and Career Growth

We’re continuously raising our performance bar as we strive to become Earth’s Best Employer. That’s why you’ll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional.

Basic Qualifications

  • 2+ years of management experience
  • 4+ years of general contractor and vendor management work (request for proposals, bidding, change orders, quality control, RFI/submittal tracking) associated with construction and project execution experience
  • Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field
  • Knowledge of the electrical and mechanical systems involved in critical data center operations including systems such as feeders, transformers, generators, switchgear, UPS systems, ATS units, PDU units, chillers, pumps, air handling units, and CRAC units
  • Experience in management
  • Experience as a general contractor and in vendor management (request for proposals, bidding, change orders, quality control, RFI/submittal tracking) associated with construction and project execution
  • Experience hiring, developing, and managing high-performing technical teams

Preferred Qualifications

  • Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, and OSHA
  • Experience owning the operation of a mission-critical team or product
  • Experience with large-scale technical operations or large-scale compute farms
  • Experience with process improvement techniques such as Kaizen, Lean Manufacturing or Six Sigma

Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status.

Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information. If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner.

The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at https://amazon.jobs/en/benefits.

USA, IN, Hobart - 153,200.00 - 254,500.00 USD annually

USA, IN, New Carlisle - 153,200.00 - 254,500.00 USD annually

Source: Amazon · View original posting (opens in new tab)

Pay in context

This role's base floor ($153,200) is above 92% of the 39 Engineering (non-software) roles in Indiana listed on this site; 2 others list the same floor. Their median floor is $116,800; the middle half runs from $107,904 to $123,921.

Only jobs on this site count, and each one publishes a base salary of $100,000 or more, so this compares six-figure jobs with each other, not with the whole market. Computed Nov 8, 2026.

This range next to 6 other live Amazon roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Amazon roles with the nearest advertised base floor
RolePublished base
Manager of Construction, Data Center Construction (this listing)$153,200 - $254,500
Senior Windows Client Engineer, Region Services Corporate Infrastructure (RSCI) - VECTOR Team$155K - $210K
Amazon Dedicated Cloud Engineer, US ADC Security$155K - $210K
Sr. Creative Manager, Brand Creative$155,100 - $209,800
Principal Business Intelligence Engineer, Amazon Customer Service$155,100 - $209,800
Technical Program Manager III - AMZ26509.1$154,785 - $201,200
Principal HRBP, AWS HR$154,700 - $209,300

Same $100K to $400K scale as every card. All Amazon roles · How to read the bar

Observed changes

  1. Began meeting the published-salary criteria
  2. First observed on the employer's board
Observed since
Employer-stated posting date
2026-10-30
Where this pay comes from

Location as the employer wrote it: US, IN, New Carlisle • US, IN, Hobart

USA, IN, Hobart - 153,200.00 - 254,500.00 USD annually

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.

Get Six Figure Work by email

Pick what you want. Nothing is selected for you unless it matches the page you are on, and nothing is sent until you confirm from a link we email you.

What would you like to receive?

A short weekly note on what employer-published pay data shows: who pays what, where, and what is changing. Once a week.

Practical notes for job seekers: interviewing, applying for six-figure roles, and making an upward move. About twice a month.

New jobs that match a search you choose. Every job listed has an employer-published base salary of $100,000 or more. At most one email a day (or weekly, your choice). Nothing is sent on days with no new matches. Alerts cover every new job, because this page has no filters.

We email you only after you confirm from a link we send to this address. We do not sell or share your address. Every email has a one-click unsubscribe link. How we handle your email.