Six Figure Work

Manager of Construction, ADC - Data Center Construction

Amazon

Company websiteamazon.com (Amazon, opens in new tab)

Base salary $153,200  to $254,500

Employer-published annual base salary, USD. Advertised base range in Culpeper, VA

Apply (opens in new tab)

You apply on the employer's own site. Six Figure Work does not handle applications.

  • LocationCulpeper, VA
  • WorkplaceWorkplace not stated
  • Status at last checkSource accepting applications when checked
  • Last checked (6 h ago) · observed since

About this job

Are you a construction leader who thrives on building critical infrastructure at massive scale? AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure — we're the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on.

As a Manager III, Technology Operations Engineering on the Data Center Construction team, you will lead, mentor, and coach a team of Construction Managers delivering data center capacity across a regional portfolio. You will own the construction lifecycle from pre-construction through procurement to onsite execution, driving safety, cost, quality, and schedule performance. This role requires approximately 50% travel to construction sites across your region, giving you direct visibility into the work your team delivers.

This position requires that the candidate selected be a US Citizen.

Key job responsibilities

  • Lead, hire, and develop a team of Construction Managers and Project Engineers, providing both strategic direction and tactical coaching to build a high-performing, inclusive team.
  • Own regional construction program delivery, defining metrics and establishing workflows that drive safety, cost, quality, and schedule performance across multiple concurrent data center projects.
  • Partner with Finance, Business Development, and cross-functional teams to develop capital budgets, coordinate land and facility acquisition, and align construction priorities with capacity demand.
  • Identify risks and areas of opportunity across the construction lifecycle, making data-driven trade-offs between short-term delivery needs and long-term program improvements.
  • Establish process improvement mechanisms that reduce cost and duration while maintaining quality and reliability standards for complex electrical and mechanical systems.

A day in the life

Your morning may start with a site visit to review construction progress alongside your Construction Managers, walking through mechanical and electrical installations and addressing safety or quality items in real time. Back at your desk, you shift into reviewing regional delivery metrics, joining planning calls with Finance and Business Development partners, and coaching a team member through a complex vendor negotiation. You regularly connect with peer managers and leadership to align priorities, share best practices, and ensure your regional program stays on track against capacity goals.

About the team

Our Data Center Construction team within AWS Infrastructure Services is responsible for delivering the physical infrastructure that powers the AWS cloud. We manage every phase of construction — from early site planning through commissioning — ensuring that each facility meets the highest standards of safety, reliability, and efficiency. We are a collaborative, mission-driven group that values creative problem-solving and continuous improvement. As AWS continues to grow, our team is at the center of that expansion, and your leadership will directly shape how we scale to meet customer demand.

Basic Qualifications

  • 2+ years of management experience
  • 4+ years of general contractor and vendor management work (request for proposals, bidding, change orders, quality control, RFI/submittal tracking) associated with construction and project execution experience
  • Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field
  • Knowledge of the electrical and mechanical systems involved in critical data center operations including systems such as feeders, transformers, generators, switchgear, UPS systems, ATS units, PDU units, chillers, pumps, air handling units, and CRAC units
  • Experience in management
  • Experience as a general contractor and in vendor management (request for proposals, bidding, change orders, quality control, RFI/submittal tracking) associated with construction and project execution
  • Experience hiring, developing, and managing high-performing technical teams

Preferred Qualifications

  • Knowledge of building codes and regulations including Life Safety, BOCA, NFPA, NEC, and OSHA
  • Experience owning the operation of a mission-critical team or product
  • Experience with large-scale technical operations or large-scale compute farms
  • Experience with process improvement techniques such as Kaizen, Lean Manufacturing or Six Sigma

Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status.

Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information. If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner.

The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at https://amazon.jobs/en/benefits.

USA, VA, Culpeper - 153,200.00 - 254,500.00 USD annually

Source: Amazon · View original posting (opens in new tab)

This range next to 6 other live Amazon roles with the nearest advertised base floor
Chart as a table
This range next to 6 other live Amazon roles with the nearest advertised base floor
RolePublished base
Manager of Construction, ADC - Data Center Construction (this listing)$153,200 - $254,500
Senior Windows Client Engineer, Region Services Corporate Infrastructure (RSCI) - VECTOR Team$155K - $210K
Amazon Dedicated Cloud Engineer, US ADC Security$155K - $210K
Sr. Creative Manager, Brand Creative$155,100 - $209,800
Principal Business Intelligence Engineer, Amazon Customer Service$155,100 - $209,800
Technical Program Manager III - AMZ26509.1$154,785 - $201,200
Principal HRBP, AWS HR$154,700 - $209,300

Same $100K to $400K scale as every card. All Amazon roles · How to read the bar

Observed changes

  1. First observed on the employer's board
  2. Began meeting the published-salary criteria
Observed since
Employer-stated posting date
2026-10-20
Where this pay comes from

Location as the employer wrote it: US, VA, Culpeper

USA, VA, Culpeper - 153,200.00 - 254,500.00 USD annually

Method
Employer text, read with fixed rules and re-verified
Checked
Rule set
us-base-v2

The pay passage appears in the employer's own job text. Fixed, deterministic rules located it, and the passage below was checked against the stored copy of the posting.

What we verified

  • The pay figures come from the employer's own listing, quoted exactly above.
  • The pay is an annual base salary in US dollars with a minimum of at least $100,000.
  • The role was publicly listed on the employer's job board when last checked.

We do not verify what the employer will actually offer, whether the employer is still recruiting for the role, or anything beyond what the employer published. Full methodology.